{"operation":"document","citation":"DCA10MP007 docket item 161","title":"Control Room and SCADA Operation - Figure 3a - Main Menu Panel on Feb. 1, 2012 2012, Source:Enbridge (NTSB IR 351)","source_type":"incident","agency":"National Transportation Safety Board","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"DCA10MP007; docket item 161; Adobe PDF file.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363637.json","markdown":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363637.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363637","source_url":"https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363637&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%203a%20-%20Main%20Menu%20Panel%20on%20Feb.%201,%202012%202012,%20Source%3AEnbridge%20(NTSB%20IR%20351)-Master.PDF","body":"Control Room and SCADA Operation - Figure 3a - Main Menu Panel on Feb. 1, 2012 2012, Source:Enbridge (NTSB IR 351) DCA10MP007 docket item 161. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.","truncated":false,"body_characters":268}