{"operation":"document","citation":"DCA10MP007 docket item 163","title":"Control Room and SCADA Operation - Figure 4 - Simulated Marshall Station with Pump Unit-3 Running on Feb. 1, 2012 Sources; Enbridge Energy (NTSB:IR 351)","source_type":"incident","agency":"National Transportation Safety Board","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"DCA10MP007; docket item 163; Adobe PDF file.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363639.json","markdown":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363639.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363639","source_url":"https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363639&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%204%20-%20Simulated%20Marshall%20Station%20with%20Pump%20Unit-3%20Running%20on%20Feb.%201,%202012%20Sources;%20Enbridge%20Energy%20(NTSB%3AIR%20351)-Master.PDF","body":"Control Room and SCADA Operation - Figure 4 - Simulated Marshall Station with Pump Unit-3 Running on Feb. 1, 2012 Sources; Enbridge Energy (NTSB:IR 351) DCA10MP007 docket item 163. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.","truncated":false,"body_characters":306}