{"operation":"document","citation":"DCA10MP007 docket item 166","title":"Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351).","source_type":"incident","agency":"National Transportation Safety Board","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"DCA10MP007; docket item 166; Adobe PDF file.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363642.json","markdown":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363642.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-docket-item-40363642","source_url":"https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363642&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%207%3A%20Simulated%20Line%206B%20Pipeline%20Display%20Leak%20on%20Feb.%201,%202012%20Source%3A%20Enbridge%20Energy%20(NTSB%3A%20IR%20351).-Master.PDF","body":"Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351). DCA10MP007 docket item 166. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.","truncated":false,"body_characters":294}