# Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351).

- **operation:** document
- **citation:** DCA10MP007 docket item 166
- **title:** Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351).
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 166; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363642.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363642.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363642
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363642&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%207%3A%20Simulated%20Line%206B%20Pipeline%20Display%20Leak%20on%20Feb.%201,%202012%20Source%3A%20Enbridge%20Energy%20(NTSB%3A%20IR%20351).-Master.PDF
**body:**

Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351). DCA10MP007 docket item 166. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 294
