# Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351).

- **operation:** document
- **citation:** DCA10MP007 docket item 167
- **title:** Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351).
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 167; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363643.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363643.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363643
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363643&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%208%3A%20Simulated%20Unacknowledged%20Alarm%20Panel%20on%20Feb.%201,%202012%20Source%3A%20Enbridge%20Energy%20(NTSB%20IR%3A%20351).-Master.PDF
**body:**

Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351). DCA10MP007 docket item 167. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 291
