# Control Room and SCADA Operation - Figure 11: Shows Griffith to marshall 5-Minutes Alarm Imbalance Source: Enbridge NTSB-PHMSA IR -1

- **operation:** document
- **citation:** DCA10MP007 docket item 170
- **title:** Control Room and SCADA Operation - Figure 11: Shows Griffith to marshall 5-Minutes Alarm Imbalance Source: Enbridge NTSB-PHMSA IR -1
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 170; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363651.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363651.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363651
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363651&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%2011%3A%20Shows%20Griffith%20to%20marshall%205-Minutes%20Alarm%20Imbalance%20Source%3A%20Enbridge%20NTSB-PHMSA%20IR%20-1-Master.PDF
**body:**

Control Room and SCADA Operation - Figure 11: Shows Griffith to marshall 5-Minutes Alarm Imbalance Source: Enbridge NTSB-PHMSA IR -1 DCA10MP007 docket item 170. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 286
