{"operation":"document","citation":"DCA10MP007 docket item 182","title":"Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy.","source_type":"incident","agency":"National Transportation Safety Board","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"DCA10MP007; docket item 182; Adobe PDF file.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-docket-item-40364011.json","markdown":"https://regulus.evalyn.ai/document/ntsb-docket-item-40364011.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-docket-item-40364011","source_url":"https://data.ntsb.gov/Docket/Document/docBLOB?ID=40364011&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%201b%3A%20Enbridge%20Energy%20Pipeline%20System%20Map%20from%20Edmonton,%20Canada%20to%20Montreal,%20Canada,%20Source%3A%20Enbridge%20Energy.-Master.PDF","body":"Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy. DCA10MP007 docket item 182. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.","truncated":false,"body_characters":303}