# Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy.

- **operation:** document
- **citation:** DCA10MP007 docket item 182
- **title:** Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy.
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 182; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364011.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364011.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364011
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40364011&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20-%20Figure%201b%3A%20Enbridge%20Energy%20Pipeline%20System%20Map%20from%20Edmonton,%20Canada%20to%20Montreal,%20Canada,%20Source%3A%20Enbridge%20Energy.-Master.PDF
**body:**

Control Room and SCADA Operation - Figure 1b: Enbridge Energy Pipeline System Map from Edmonton, Canada to Montreal, Canada, Source: Enbridge Energy. DCA10MP007 docket item 182. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 303
