# Control Room and SCADA Operations - Figure 1a: Enbridge Energy Line 6B Active Pump Stations on July 25 & 26, 2010, Source: Enbridge Energy.

- **operation:** document
- **citation:** DCA10MP007 docket item 184
- **title:** Control Room and SCADA Operations - Figure 1a: Enbridge Energy Line 6B Active Pump Stations on July 25 & 26, 2010, Source: Enbridge Energy.
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 184; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364032.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364032.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40364032
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40364032&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operations%20-%20Figure%201a%3A%20Enbridge%20Energy%20Line%206B%20Active%20Pump%20Stations%20on%20July%2025%20%26%2026,%202010,%20Source%3A%20Enbridge%20Energy.-Master.PDF
**body:**

Control Room and SCADA Operations - Figure 1a: Enbridge Energy Line 6B Active Pump Stations on July 25 & 26, 2010, Source: Enbridge Energy. DCA10MP007 docket item 184. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 293
