# IMP Attachment V - reference-21, IR 376: Automated Pressure Cycling Analysis - Appendix 2, Crack Management Program Page 1

- **operation:** document
- **citation:** DCA10MP007 docket item 259
- **title:** IMP Attachment V - reference-21, IR 376: Automated Pressure Cycling Analysis - Appendix 2, Crack Management Program Page 1
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 259; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40371187.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40371187.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40371187
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40371187&FileExtension=.PDF&FileName=IMP%20Attachment%20V%20-%20reference-21,%20IR%20376%3A%20Automated%20Pressure%20Cycling%20Analysis%20-%20Appendix%202,%20Crack%20Management%20Program%20Page%201-Master.PDF
**body:**

IMP Attachment V - reference-21, IR 376: Automated Pressure Cycling Analysis - Appendix 2, Crack Management Program Page 1 DCA10MP007 docket item 259. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 276
