# Operations - PHMSA 2010 Evaluation Report of Liquid Pipeline Construction (Aug and Sept)-1

- **operation:** document
- **citation:** DCA15MP002 docket item 69
- **title:** Operations - PHMSA 2010 Evaluation Report of Liquid Pipeline Construction (Aug and Sept)-1
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA15MP002; docket item 69; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453188.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453188.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453188
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40453188&FileExtension=.PDF&FileName=Operations%20-%20PHMSA%202010%20Evaluation%20Report%20of%20Liquid%20Pipeline%20Construction%20(Aug%20and%20Sept)-1-Master.PDF
**body:**

Operations - PHMSA 2010 Evaluation Report of Liquid Pipeline Construction (Aug and Sept)-1 DCA15MP002 docket item 69. 9 pages. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 244
