# Operations - PHMSA 2011 Evaluation Report of Liquid Pipeline Construction (May June July Oct Nov and Dec)

- **operation:** document
- **citation:** DCA15MP002 docket item 70
- **title:** Operations - PHMSA 2011 Evaluation Report of Liquid Pipeline Construction (May June July Oct Nov and Dec)
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA15MP002; docket item 70; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453189.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453189.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40453189
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40453189&FileExtension=.PDF&FileName=Operations%20-%20PHMSA%202011%20Evaluation%20Report%20of%20Liquid%20Pipeline%20Construction%20(May%20June%20July%20Oct%20Nov%20and%20Dec)-Master.PDF
**body:**

Operations - PHMSA 2011 Evaluation Report of Liquid Pipeline Construction (May June July Oct Nov and Dec) DCA15MP002 docket item 70. 8 pages. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 259
