# Interview Transcripts LE Bell Excavation Contractor Sup't Leroy Clark (13-14 Dec 2017 interviews) [transcript + errata]

- **operation:** document
- **citation:** DCA17FP002 docket item 10
- **title:** Interview Transcripts LE Bell Excavation Contractor Sup't Leroy Clark (13-14 Dec 2017 interviews) [transcript + errata]
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA17FP002; docket item 10; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40478186.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40478186.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40478186
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40478186&FileExtension=.PDF&FileName=Interview%20Transcripts%20LE%20Bell%20Excavation%20Contractor%20Sup%27t%20Leroy%20Clark%20(13-14%20Dec%202017%20interviews)%20%5Btranscript%20%2B%20errata%5D-Master.PDF
**body:**

Interview Transcripts LE Bell Excavation Contractor Sup't Leroy Clark (13-14 Dec 2017 interviews) [transcript + errata] DCA17FP002 docket item 10. 66 pages. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 274
