# ATTACHMENT #50 - INTERVIEW OF GAS SYSTEM PLANNING SUPERVISOR - PG&E - 2-10-19

- **operation:** document
- **citation:** PLD19MR001 docket item 45
- **title:** ATTACHMENT #50 - INTERVIEW OF GAS SYSTEM PLANNING SUPERVISOR - PG&E - 2-10-19
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19MR001; docket item 45; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-8615078.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-8615078.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-8615078
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=8615078&FileExtension=pdf&FileName=PLD19MR001_Nathan%20Spidell%20with%20Errata_Redacted-Rel.pdf
**body:**

ATTACHMENT #50 - INTERVIEW OF GAS SYSTEM PLANNING SUPERVISOR - PG&E - 2-10-19 PLD19MR001 docket item 45. 89 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 228
