# 2 - OPS - ATMOS ENERGY TIMELINE AS OF APRIL 4, 2018

- **operation:** document
- **citation:** PLD18FR002 docket item 25
- **title:** 2 - OPS - ATMOS ENERGY TIMELINE AS OF APRIL 4, 2018
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD18FR002; docket item 25; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-9966037.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-9966037.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-9966037
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=9966037&FileExtension=pdf&FileName=F_Timeline%20Version%206%20-%2004-04-18%20@1415%20(AEC-NTSB-001410-001415)_Redacted-Rel.pdf
**body:**

2 - OPS - ATMOS ENERGY TIMELINE AS OF APRIL 4, 2018 PLD18FR002 docket item 25. 6 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 201
