{"operation":"document","citation":"P-12-015","title":"NTSB Safety Recommendation P-12-015","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"2012-07-25","effective_on":"2012-07-25","summary":"TO ENBRIDGE INCORPORATED: Review and update your oil pipeline emergency response procedures and equipment resources to ensure that appropriate containment equipment and methods are available to respond to all environments and at all locations along the pipeline to minimize the spread of oil from a pipeline rupture.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-12-015.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-12-015.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-12-015","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-12-015","body":"NTSB safety recommendation P-12-015.\n\nTO ENBRIDGE INCORPORATED: Review and update your oil pipeline emergency response procedures and equipment resources to ensure that appropriate containment equipment and methods are available to respond to all environments and at all locations along the pipeline to minimize the spread of oil from a pipeline rupture.\n\nPriority: CLASS II\n\nOverall Status: Closed - Acceptable Action\n\nIssued Date: 2012-07-25\n\nAdopted Date: 2012-07-10\n\nOverall Date Closed: 2014-09-16\n\nSynopsis: On Sunday, July 25, 2010, about 5:58 p.m., eastern daylight time, a segment of a 30-inch-diameter pipeline (Line 6B), owned and operated by Enbridge Incorporated (Enbridge) ruptured in a wetland in Marshall, Michigan. The rupture occurred during the last stages of a planned shutdown and was not discovered or addressed for 17 hours. During the time lapse, Enbridge twice pumped additional oil (81 percent of the total release) into Line 6B during two startups; the total release was estimated to be 843,444 gallons of crude oil. The oil saturated the surrounding wetlands and flowed into the Talmadge Creek and the Kalamazoo River. Local residents self-evacuated from their houses, and the environment was negatively affected. Cleanup efforts continue as of the adoption date of this report, with continuing costs exceeding $767 million. About 320 people reported symptoms consistent with benzene exposure. No fatalities were reported.\n\nProbable Cause: The National Transportation Safety Board (NTSB) determines that the probable cause of the pipeline rupture was corrosion fatigue cracks that grew and coalesced from crack and corrosion defects under disbonded polyethylene tape coating, producing a substantial crude oil release that went undetected by the control center for over 17 hours. The rupture and prolonged release were made possible by pervasive organizational failures at Enbridge Incorporated (Enbridge) that included the following: Deficient integrity management procedures, which allowed well-documented crack defects in corroded areas to propagate until the pipeline failed. Inadequate training of control center personnel, which allowed the rupture to remain undetected for 17 hours and through two startups of the pipeline. Insufficient public awareness and education, which allowed the release to continue for nearly 14 hours after the first notification of an odor to local emergency response agencies. Contributing to the accident was the Pipeline and Hazardous Materials Safety Administration’s (PHMSA) weak regulation for assessing and repairing crack indications, as well as PHMSA’s ineffective oversight of pipeline integrity management programs, control center procedures, and public awareness. Contributing to the severity of the environmental consequences were (1) Enbridge’s failure to identify and ensure the availability of well-trained emergency responders with sufficient response resources, (2) PHMSA’s lack of regulatory guidance for pipeline facility response planning, and (3) PHMSA’s limited oversight of pipeline emergency preparedness that led to the approval of a deficient facility response plan.\n\nNtsbnumber: DCA10MP007\n\nReport Number: PAR-12-01\n\nAddressee Name: Enbridge, Inc.\n\nAddressee Status: Closed - Acceptable Action\n\nAddressee Date Closed: 2014-09-16\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2012-10-22\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: -From Al Monaco, President and Chief Executive Officer: Enbridge Energy, Limited Partnership (\"Enbridge\") submits this letter and attachments in response to the National Transportation Safety Board's (NTSB) letter dated July 25, 2012 concerning the NTSB's July 10, 2012 Report on the release of crude oil from Enbridge's Line 6B pipeline near Marshall, Michigan on July 25,2010. We have either already, or will soon be, fully implementing all of the NTSB recommendations. The initiatives outlined in our response have enhanced previous efforts that were in progress before this accident. This includes an undertaking to review and improve our processes by incorporating an Integrated Management System, and revising the processes that will form the basis for our Safety Management System. Enbridge recognizes the critical role the NTSB is entrusted with to investigate transportation accidents to determine probable cause and make recommendations to mitigate the likelihood of recurrence, and we appreciate the significant effort the NTSB has made while investigating the accident on our Line 6B pipeline. Enbridge and the NTSB have a mutual goal in relation to safe operation of pipelines. To this end, Enbridge has been transparent and responsive while serving as a cooperative and integral member to the investigation team. The primary objective throughout the investigation has been to identify root cause and possible contributing factors so that we, and others, can implement appropriate measures to prevent reoccurrence and to continually improve the safety of pipeline operations. From the outset, Enbridge has taken every opportunity to learn from this accident and apply enhancements to the system, processes, procedures and our organizational structure, immediately and throughout the investigative process. We have developed a comprehensive plan to lead these and other safety related initiatives now and in the future, and will continue to utilize our leadership position in the liquids pipeline industry to share learnings and promote safety enhancements. Enbridge prides itself on having a culture that is focused on its values of Integrity, Safety and Respect in support of our communities, the environment and each other. Our employees take great pride in their work and also take responsibility and full accountability for actions when things go wrong. We believe that Enbridge's actions following the Marshall release have demonstrated adherence to these values. We committed to clean up the spill and we have delivered on that promise. In fact, we have received many testimonials that the river is in excellent condition. Enbridge has always emphasized the importance of safety in our operations. The pipeline industry has substantially improved its release performance in the last decade and Enbridge has led the way in that effort. Despite this record, we recognize that no accident is acceptable and continuous improvement is essential as we strive for operational excellence. Enbridge will continue to implement actions and system enhancements, focused on attaining our goal of zero incidents. I can assure you that Enbridge will remain diligent and determined in this regard. Please don't hesitate to contact me if you have any concerns. Enbridge Response: We have addressed the recommendation to review and update our pipeline emergency response procedures and equipment resources to ensure that appropriate containment equipment and methods are available to respond to all environments and at all locations along the pipeline to minimize the spread of oil from a pipeline rupture in the following manner: 1) A project team has been assembled, with oversight from an independent expert to review the emergency response procedures contained in Enbridge’s Operation and Maintenance Procedures (“O&MPs”) Book 7, Parts I (general) and II (regional specific). The review is focused on content, usability and regulatory requirements for submission. 2) An independent expert has been contracted to evaluate the Crisis Management Plan and recommend improvements to streamline the plan and ensure consistency with the overall ER Plan. 3) Equipment has been identified, with the assistance of local Operations input, and funds approved and allocated in the following ER areas: •?Dedicated Emergency Response: Equipment, vehicles, trailers and buildings used to support initial response to a pipeline emergency (release, fire, business continuity, security) in an effort to protect the public, personnel and the environment. •?Identified Emergency Response: Equipment, vehicles, trailers and buildings that can be used for normal operations as well as for emergency response. •?Emergency Pipeline Repair Response: This is equipment needed to repair the pipe (vapor tools, stopple towers, tapping machines, leaking defect sleeves, Plidco Sleeves, security pipe, etc.).\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2014-01-15\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: -From Al Monaco, President and CEO: Enbridge Energy, Limited Partnership (\"Enbridge\") submits this letter and attachment as an update to our previous letter of October 22, 2012 and in response to the National Transportation Safety Board (\"NTSB\") letter dated July 25, 2012. Over the past year, Enbridge has made great progress in relation to implementing enhancements in the areas of safety and operational reliability. Our focus remains on delivering energy safely and reliably. As such, of the 47 commitments we made in our correspondence of October 22, 2012, 45 have been completed (some have ongoing reviews and implementations) and we expect the final two commitments to be completed by the end of 2014. In addition to the commitments made over a year ago, we have taken additional steps to enhance our safety performance and operational reliability. In 2013, Enbridge appointed a Senior Vice President of Enterprise Safety and Operational Reliability reporting directly to me. A key responsibility of this role is to coordinate a consistent approach across all of Enbridge's business activities to build, share, and promote industry-leading safety practices and culture. Throughout the past year, we continued, through communications and training programs, to actively involve our employees and contractors in achieving our goal of zero incidents – which we call our \"Path to Zero\". As such, we have provided additional guidance to our workforce through the establishment of Health & Safety Principles that supplement our existing Lifesaving Rules. To further our progress, one of our key initiatives in 2013 was to conduct an enterprise-wide safety perception survey to measure our advancements in relation to safety culture. More than 90% of Enbridge employees participated in the survey, a strong indicator on its own of the level of employee engagement in meeting our safety objectives. That survey, which is evaluated by DuPont, found that tremendous progress occurred in all aspects of safety (leadership, structure, processes and actions), such that Enbridge has achieved the Independent Stage of Safety Culture - a positive measure of the relative strength of our safety culture. Measuring our progress is important to us and to that end, Enbridge retained an independent consultant to verify and make suggestions for improvements in relation to pipeline integrity, leak detection, and public safety. That is in addition to the ongoing regular audits and inspections conducted by our various regulatory agencies. All of the information provided through regulatory or independent audits, is useful to Enbridge and our industry in order for us to all continue down the Path to Zero incidents. Finally, Enbridge has actively participated and presented in numerous industry and regulator led initiatives to advance industry safety, such as the National Energy Board Safety Forum and API's quarterly Hazardous Liquid Pipeline Shared Practices Virtual Tailgate conferences. As discussed earlier, Enbridge has made significant strides in the area of safety culture and performance and I am proud of what we have been able to accomplish during the past year. However, as I indicated previously, Enbridge will remain diligent and is determined to continually improve our safety culture, performance and to lead industry in safety best practices. As we continue on our Path to Zero, we will continue to improve our safety processes through the use of management systems, by monitoring our progress, and by seeking out opportunities to enhance our risk management processes. I trust the attachment provides a satisfactory update and I would ask that you contact me directly should you have any questions in relation to our update. P-12-015: We have addressed the recommendation to review and update our pipeline emergency response procedures and equipment resources to ensure that appropriate containment equipment and methods are available to respond to all environments and at all locations along the pipeline to minimize the spread of oil from a pipeline rupture in the following manner: 1) A project team has been assembled, with oversight from an independent expert to review the emergency response procedures contained in Enbridge’s Operation and Maintenance Procedures (“O&MPs”) Book 7, Parts I (general) and II (regional specific). The review is focused on content, usability and regulatory requirements for submission. Completed. 2) An independent expert has been contracted to evaluate the Crisis Management Plan and recommend improvements to streamline the plan and ensure consistency with the overall ER Plan. Completed. 3) Equipment has been identified, with the assistance of local Operations input, and funds approved and allocated in the following ER areas: •?Dedicated Emergency Response: Equipment, vehicles, trailers and buildings used to support initial response to a pipeline emergency (release, fire, business continuity, security) in an effort to protect the public, personnel and the environment. •?Identified Emergency Response: Equipment, vehicles, trailers and buildings that can be used for normal operations as well as for emergency response. •?Emergency Pipeline Repair Response: This is equipment needed to repair the pipe (vapor tools, stopple towers, tapping machines, leaking defect sleeves, Plidco Sleeves, security pipe, etc.). Completed and ongoing.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2014-07-23\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: -From Al Monaco, President and CEO: On July 25, 2012 the National Transportation Safety Board (\"NTSB\") issued safety recommendations to Enbridge Energy, Limited Partnership (\"Enbridge\") as a result of the investigation of the July 25, 2010 pipeline incident. Enbridge provided an initial response to the NTSB recommendations on October 22, 2012 and a subsequent update on January 15, 2014, to which the NTSB responded on March 21, 2014. The purpose of this letter is to provide an interim update on the remaining open recommendations (P-12-11 , P-12-1 3, and P-12-15). Enbridge continues to implement enhancements in the areas of safety and operational reliability. Our focus remains on delivering energy safely and reliably. Of the 47 identified commitments that address the NTSB's recommendations, Enbridge is pleased to report that, 45 are complete and 1 is substantially complete. I expect the final commitment in relation to conducting a reliability engineering analysis of the effectiveness of hydrostatic testing in conjunction with in-line inspection tools (ILl), based on Enbridge's most recent hydrostatic tested pipelines, to be complete prior to year-end 2014. The attached document summarizes the status of each item in the open recommendations. Additionally, we provide the following information to address items raised in your letter of March 21, 2014. Recommendation P-12-15: The NTSB requested a copy of Enbridge's Emergency Response Plan. Our Integrated Contingency Plan (ICP), which replaces the Enbridge Operating and Maintenance Procedures Book 7 parts I and II, is available for viewing through our Merrill Data site. The ICP has undergone a rigorous approval process by PHMSA and was approved in 2013 as part of the five year emergency response plan review cycle prescribed by regulation. As such, Enbridge believes this Recommendation to now be satisfied. Enbridge has made considerable progress to not only diligently address the NTSB recommendations, but to sustain a culture of continual improvement, so that we learn from our experiences and others' and use that information to drive better processes and practices to keep our people, the public, and the environment safe. We expect to close out the last few open recommendations in the next few months and believe that when the last few items are satisfied, we will already have improved upon some of the recommendations that have already been closed. Enbridge Response: We have addressed the recommendation to review and update our pipeline emergency response procedures and equipment resources to ensure that appropriate containment equipment and methods are available to respond to all environments and at all locations along the pipeline to minimize the spread of oil from a pipeline rupture in the following manner: 1) A project team has been assembled, with oversight from an independent expert to review the emergency response procedures contained in Enbridge’s Operation and Maintenance Procedures (“O&MPs”) Book 7, Parts I (general) and II (regional specific). The review is focused on content, usability and regulatory requirements for submission. Completed. 2) An independent expert has been contracted to evaluate the Crisis Management Plan and recommend improvements to streamline the plan and ensure consistency with the overall ER Plan. Completed. 3) Equipment has been identified, with the assistance of local Operations input, and funds approved and allocated in the following ER areas: •?Dedicated Emergency Response: Equipment, vehicles, trailers and buildings used to support initial response to a pipeline emergency (release, fire, business continuity, security) in an effort to protect the public, personnel and the environment. •?Identified Emergency Response: Equipment, vehicles, trailers and buildings that can be used for normal operations as well as for emergency response. •?Emergency Pipeline Repair Response: This is equipment needed to repair the pipe (vapor tools, stopple towers, tapping machines, leaking defect sleeves, Plidco Sleeves, security pipe, etc.). Completed.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2012-12-18\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: The NTSB notes that Enbridge has contracted with an outside expert and assembled a project team to review and update its emergency response procedures and response equipment, as requested. Pending completion of these actions, Safety Recommendation P-12-15 is classified OPEN—ACCEPTABLE RESPONSE. We would appreciate receiving a copy of Enbridge’s Operation and Maintenance Procedures, book 7, parts I (general) and II (regional specific), when the information becomes available.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2014-03-21\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: We understand that you have reviewed and revised the emergency response procedures contained in your Operation and Maintenance Procedures, book 7, Parts I (general) and II (region-specific); have evaluated your crisis management plan and recommended improvements to streamline it and ensure consistency with the overall Emergency Response Plan; and have identified equipment and funds approved and allocated in the areas of dedicated emergency response, identified emergency response, and emergency pipeline repair response. Accordingly, Safety Recommendation P-12-15 is classified OPEN—ACCEPTABLE RESPONSE. We would appreciate receiving a copy of the revised Enbridge Operation and Maintenance Procedures, book 7, parts I and II.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 2014-09-16\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: From your January 15, 2014, update, we understood you had completed the requested action, and we note that your Integrated Contingency Plan (ICP) has replaced your Operation and Maintenance Procedures, book 7, parts I and II. We are pleased to learn that the ICP was evaluated and approved by the Pipeline and Hazardous Materials Safety Administration in 2013 as part of the required 5-year emergency response plan review cycle. Accordingly, Safety Recommendation P-12-15 is classified CLOSED—ACCEPTABLE ACTION.","truncated":false,"body_characters":20303}