{"operation":"document","citation":"P-70-039","title":"NTSB Safety Recommendation P-70-039","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"1970-10-14","effective_on":"1970-10-14","summary":"THE NTSB RECOMMENDS THAT IOWA SOUTHERN UTILITIES, INC., TAKE THE FOLLOWING ACTION: IMPROVE ITS ABILITY TO RECEIVE AND PROCESS TELEPHONE CALLS DURING EMERGENCIES.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-70-039.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-70-039.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-70-039","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-70-039","body":"NTSB safety recommendation P-70-039.\n\nTHE NTSB RECOMMENDS THAT IOWA SOUTHERN UTILITIES, INC., TAKE THE FOLLOWING ACTION: IMPROVE ITS ABILITY TO RECEIVE AND PROCESS TELEPHONE CALLS DURING EMERGENCIES.\n\nPriority: CLASS II\n\nOverall Status: Closed - Unacceptable Action\n\nIssued Date: 1970-10-14\n\nAdopted Date: 1970-10-14\n\nOverall Date Closed: 1976-07-20\n\nSynopsis: ON NOVEMBER 6, 1969, DURING A HIGHWAY CONSTRUCTION PROJECT IN BURLINGTON, IOWA, A BULLDOZER WEIGHING 70,000 POUNDS DROVE OVER AND PARTIALLY COLLAPSED THE STEEL COVERS OF A GAS REGULATOR PIT, DAMAGING THE REGULATOR. WHILE THE PRESSURE WAS PARTIALLY CONTROLLED BY A MONITORING OR SAFETY REGULATOR, GAS, REPORTEDLY AT FOUR TO FIVE TIMES THE NORMAL OPERATING PRESSURE, ENTERED THE DISTRIBUTION SYSTEM. GAS CUSTOMERS IN THE AFFECTED AREA STARTED REPORTING HIGH GAS PILOTS AND FIRES TO ISU AND THE FIRE DEPARTMENT. THE HIGH-PRESSURE GAS SOURCE WAS TURNED OFF BUT FIRES CONTINUED TO BE REPORTED, THE FIRES WROUGHT MAJOR DAMAGE TO THE INTERIORS OF 10 HOUSES AND MINOR DAMAGE TO KITCHENS AND APPLIANCES IN 42 OTHERS. PROPERTY DAMAGE WAS ESTIMATED AT $80,000.\n\nProbable Cause: The probable cause of the fires in the houses was the continued overpressure condition of the low-pressure distributions system for an extended period of time, which allowed pressure to build up until high gas flames ignited nearby objects. The initiation of the overpressure was caused by a bulldozer which damaged the largest primary working regulator which, with other regulators, controlled the gas pressure entering the low-pressure systems; and by inadequate performance of the monitoring regulator which failed to operate to limit the gas pressure to a safe level.\n\nNtsbnumber: DCA70MP001\n\nReport Number: PAR-70-01\n\nAddressee Name: Iowa Southern Utilities, Inc.\n\nAddressee Status: Closed--No Longer Applicable\n\nAddressee Date Closed: 1976-07-20\n\nAddressee Acronym: ISU\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1971-07-07\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: THE BOARD WAS INFORMED BY LETTER THAT THE FOLLOWING ACTION HAS BEEN TAKEN: THE RECOMMENDATION TO IMPROVE THE ABILITY TO RECEIVE AND PROCESS TELEPHONE CALLS DURING EMERGENCIES IS BEING STUDIED. THIS BECOMES A PROBLEM OF NUMBERS, THE NUMBER OF DIRECT TELEPHONE LINES PURCHASED, AND THE NUMBER OF QUALIFIED PEOPLE TO HANDLE EMERGENCY CALLS. DURING THE TIME OF EMERGENCY, THIS BECOMES LARGE NUMBERS AND COULD APPROACH THE NUMBER OF CUSTOMERS AFFECTED BY THE INCIDENT. TO DATE, THE STUDIES HAVE NOT PRODUCED A SATISFACTORY AND FEASIBLE METHOD OF SUBSTANTIALLY INCREASING TELEPHONE SERVICE DURING EMERGENCIES. CORRESPONDENCE DOCUMENTATION INCOMPLETE.\n\nAddressee Acronym: ISU\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1971-06-02\n\nCommunication Type: Official Correspondence","truncated":false,"body_characters":2849}