# NTSB Safety Recommendation P-76-087

- **operation:** document
- **citation:** P-76-087
- **title:** NTSB Safety Recommendation P-76-087
- **source type:** guidance
- **agency:** National Transportation Safety Board
- **status:** guidance
- **official:** true
- **published on:** 1977-01-31
- **effective on:** 1977-01-31
- **summary:** SUBMIT PRECISE, ACCURATE DATA CONCERNING THE DEPTH AND AND LOCATION OF ITS PIPELINES FOR ALL FUTURE CONSTRUCTION PROJECTS.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-recommendation-p-76-087.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-recommendation-p-76-087.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-recommendation-p-76-087
- **source url:** https://data.ntsb.gov/carol-main-public/sr-details/P-76-087
**body:**

NTSB safety recommendation P-76-087.

SUBMIT PRECISE, ACCURATE DATA CONCERNING THE DEPTH AND AND LOCATION OF ITS PIPELINES FOR ALL FUTURE CONSTRUCTION PROJECTS.

Priority: CLASS II

Overall Status: Closed - Acceptable Action

Issued Date: 1977-01-31

Adopted Date: 1976-12-09

Overall Date Closed: 1987-04-23

Synopsis: ON JUNE 16, 1976, A PIECE OF CONSTRUCTION EQUIPMENT EXCAVATING FOR A STREET WIDENING PROJECT ON VENICE BOULEVARD IN LOS ANGELES, CALIFORNIA, STRUCK AND PUNCTURED AN 8-INCH PETROLEUM PRODUCTS PIPELINE OWNED BY THE STANDARD OIL COMPANY OF CALIFORNIA. THE ESCAPING GASOLINE SPRAYED ON NEARBY BUILDINGS AND IGNITED, 9 PERSONS WERE KILLED, 14 PERSONS WERE INJURED, 7 BUILDINGS WERE DESTROYED, OTHER BUILDINGS WERE DAMAGED BY FIRE AND HEAT, AND 15 VEHICLES WERE DESTROYED.

Ntsbnumber: DCA76MP021

Report Number: PAR-76-08

Addressee Name: Standard Oil Company

Addressee Status: Closed - Acceptable Action

Addressee Date Closed: 1987-04-23

Addressee Organization Type: P-Private Industry

Communication Date: 1987-01-12

Communication Type: Official Correspondence

Communication Contents: THIS IS ACTUALLY A FOLLOWUP AND THE FOLLOWING IS A HISTORY OF PAST CORRESPONDENCE. CHEVRON'S LETTER OF 1/25/77, COMMENTING ON BOARD'S REPORT OF ACCIDENT, NTSB'S 2/8/77, LETTER INDICATING THAT CHEVRON'S COMMENTS ARE BEING REVIEWED, CHEVRON'S MARCH 11, 1977, LETTER REQUESTING TO BE INFORMED OF STATUS OF ERRATA SHEET, CHEVRON'S 3/28/77, LETTER CONFIRMING MEETING AND COMMENTING FURTHER ON BOARD'S REPORT, NTSB'S APRIL 22, 1977, LETTER FURTHER REGARDING BOARD'S REPORTS IF ACCIDENT, CHEVRON'S MARCH 2, 1981, LETTER IN RESPONSE TO INQUIRY REGARDING ACTION TAKEN ON RECOMMENDATIONS, NTSB'S JUNE 7, 1985, LETTER REQUESTING INFORMATION ON ACTIONS TAKEN TO IMLEMENT THE BOARD'S RECOMMENDATIONS AND CHEVRON'S JUNE 26, 1985, LETTER INDICATING THAT IT IS REVIEWING THE MATTER AND THAT A REPORT IN THE RECOMMENDATIONS WOULD BE FORTHCOMING IN THE NEAR FUTURE.

Addressee Organization Type: P-Private Industry

Communication Date: 1987-02-13

Communication Type: Official Correspondence

Communication Contents: THE PIPELINE COMPANY PROVIDES UPON REQUEST ALL AVAILABLE DATA CONCERNING THE LOCATION OF ITS PIPELINES. IT ALSO FURNISHES RECENTLY OBTAINED PIPELINE ELEVATION DATA FOR SPECIFIC LOCATIONS IF SUCH DATA IS AVIALABLE. IF THE PIPE LINE DEPTH DATA IS NOT CURRENT, WE POTHOLE OUR PIPELINE, OR CAUSE THE CONTRACTOR TO POTHOLE THE PIPELINE WITH OUR IN SPECTOR PRESENT, TO DETERMINE ITS DEPTH AT THE CONSTRUCTION SITE.

Addressee Organization Type: P-Private Industry

Communication Date: 1981-03-02

Communication Type: Official Correspondence

Addressee Organization Type: P-Private Industry

Communication Date: 1987-01-12

Communication Type: Official Correspondence

Addressee Organization Type: P-Private Industry

Communication Date: 1985-06-07

Communication Type: Official Correspondence

Addressee Organization Type: P-Private Industry

Communication Date: 1987-04-23

Communication Type: Official Correspondence
- **truncated:** false
- **body characters:** 3018