{"operation":"document","citation":"P-77-023","title":"NTSB Safety Recommendation P-77-023","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"1977-08-31","effective_on":"1977-08-31","summary":"INSTALL A CLOSED CIRCUIT-TYPE VIDEO CAMERA IN THE PUMP ROOM AND TURBINE ROOM TO ALLOW THE PUMP STATION CONTROL CENTER TO MONITOR VISUALLY ALL ACTIVITIES AT THESE LOCATIONS. (URGENT)","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-77-023.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-77-023.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-77-023","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-77-023","body":"NTSB safety recommendation P-77-023.\n\nINSTALL A CLOSED CIRCUIT-TYPE VIDEO CAMERA IN THE PUMP ROOM AND TURBINE ROOM TO ALLOW THE PUMP STATION CONTROL CENTER TO MONITOR VISUALLY ALL ACTIVITIES AT THESE LOCATIONS. (URGENT)\n\nPriority: CLASS I\n\nOverall Status: Closed - Acceptable Action\n\nIssued Date: 1977-08-31\n\nAdopted Date: 1977-08-30\n\nOverall Date Closed: 1978-05-04\n\nSynopsis: ON JULY 8, 1977, AN EXPLOSION AND FIRE OCCURRED AT ALYESKA PIPELINE SERVICE COMPANY'S PUMP STATION NO. 8 ON THE TRANS-ALASKA PIPELINE. AS A RESULT OF THE ACCIDENT ONE PERSON DIED AND FIVE PERSONS WERE INJURED.\n\nNtsbnumber: DCA77MP026\n\nReport Number: PAR-78-02\n\nAddressee Name: Alyeska Pipeline Service Company\n\nAddressee Status: Closed--No Longer Applicable\n\nAddressee Date Closed: 1978-05-04\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1977-09-16\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: ALYESKA PIPELINE SERVICE COMPANY LTR: DESIGN WORK IS NEARING COMPLETION. THE FIRST CAMERA SHOULD BE INSTALLED IN MID-OCTOBER. SYSTEM WILL CONSIST OF TWO CAMERAS COVERING THE OPPOSITE ENDS OF THE PUMP ROOM. ONE OF THESE CAMERAS WILL HAVE REMOTE PAN-TILT-ZOOM. A THIRD CAMERA WILL COVER THE PUMP ROOM SUMP AND CAMERAS 4 AND 5 WILL COVER THE MANIFOLD BUILDING. THERE WILL BE TWO MONITOR SCREENS IN THE CONTROL ROOM, ONE MANUAL AND STEADY AND THE OTHER ROTATIONAL. 11/7/77 - ALYESKA PIPELINE SERVICE COMPANY THE CLOSED CIRCUIT VIDEO SYSTEM HAS BEEN INSTALLED AND IS FUNCTIONAL AT TWO PUMP STATIONS, THE LINE WIDE SYSTEM IS EXPECTED TO BE COMPLETE BY 12/25/77. THE CAMERAS WHICH ARE CURRENTLY OPERATIONAL ARE OPERATING QUITE SATISFACTORILY AT THIS TIME NO PROBLEMS ARE ANTICIPATED. 3/20/78 - ALYESKA PIPELINE COMPANY LTR: THE LINE-WIDE CLOSED CIRCUIT TELEVISION SYSTEM IS COMPLETE AND IN OPERATION.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1977-10-20\n\nCommunication Type: Official Correspondence","truncated":false,"body_characters":1941}