{"operation":"document","citation":"P-84-032","title":"NTSB Safety Recommendation P-84-032","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"1984-08-23","effective_on":"1984-08-23","summary":"THE NTSB RECOMMENDS THAT THE WASHINGTON GAS LIGHT COMPANY: ASSESS DEPARTMENTAL TRAINING ACTIVITY TO IDENTIFY IMPROVEMENTS NECESSARY TO ADEQUATELY PREPARE EMPLOYEES TO CARRY OUT SAFELY ALL ASSIGNED RESPONSIBILITIES, CORRECT DEFICIENCIES FOUND, AND EVALUATE THE APPROPRIATENESS OF THE POLICY WHICH MAKES EMPLOYEE TRAINING A DEPARTMENTAL RESPONSIBILITY RATHER THAN AN INTEGRATED COMPANY ACTIVITY.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-032.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-032.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-032","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-84-032","body":"NTSB safety recommendation P-84-032.\n\nTHE NTSB RECOMMENDS THAT THE WASHINGTON GAS LIGHT COMPANY: ASSESS DEPARTMENTAL TRAINING ACTIVITY TO IDENTIFY IMPROVEMENTS NECESSARY TO ADEQUATELY PREPARE EMPLOYEES TO CARRY OUT SAFELY ALL ASSIGNED RESPONSIBILITIES, CORRECT DEFICIENCIES FOUND, AND EVALUATE THE APPROPRIATENESS OF THE POLICY WHICH MAKES EMPLOYEE TRAINING A DEPARTMENTAL RESPONSIBILITY RATHER THAN AN INTEGRATED COMPANY ACTIVITY.\n\nPriority: CLASS II\n\nOverall Status: Closed - Acceptable Action\n\nIssued Date: 1984-08-23\n\nAdopted Date: 1984-08-09\n\nOverall Date Closed: 1990-06-18\n\nSynopsis: ON OCTOBER 13, 1983, SEVEN EMPLOYEES OF THE WASHINGTON GAS LIGHT COMPANY WERE ASSIGNED TO PERFORM REQUIRED ANNUAL OPERATING AND MAINTENANCE INSPECTIONS ON A FLOW CONTROL VALVE AND A PRESSURE CONTROL VALVE AT ITS HERNDON GATE STATION IN FAIRFAX COUNTY, VIRGINIA. AS PART OF THE WORK TO BE DONE, THE EMPLOYEES DISCONNECTED THE GAS CONTROL SIGNAL LINE AND REMOVED THE BOLTS OF THE FLOW CONTROL VALVE BONNET BEFORE INSPECTING THE PIPE SEGMENT CONTAINING THE CONTROL VALVES TO INSURE THAT IT HAD BEEN ISOLATED AND VENTED PROPERLY. AT 10:13 A.M., WHILE TRYING TO REMOVE THE VALVE BONNET, NATURAL GAS AT ABOUT 150 PSIG BLEW THE BONNET UPWARD, AND GAS FILLED THE ENCLOSED PORTION OF THE BUILDING IN WHICH THE EMPLOYEES WERE WORKING. THE EMPLOYEES WITHIN THE STATION FLED OUTSIDE TO SAFETY; HOWEVER, THE FOREMAN REENTERED THE BUILDING. MOMENTS LATER, AT 10:18 A.M., GAS WAS IGNITED AND EXPLOSION AND FIRE, FOLLOWED DEMOLISHING THE BUILDING. THE FOREMAN WAS KILLED AND TWO EMPLOYEES RECEIVED MINOR INJURIES. THE CIRCUMSTANCES OF THIS ACCIDENT, AS WELL AS THOSE INVOLVED IN THE OCTOBER 29, 1982, ACCIDENT AT BURKE, VIRGINIA, INDICATE THE NEED FOR BETTER TRAINING OF WGL EMPLOYEES TO SUPPORT THEIR UNDERSTANDING OF PROCEDURES AND TO BE ALERT TO THE POTENTIAL CONSEQUENCES WHEN SUCH PROCEDURES ARE NOT CARRIED OUT EXPLICITLY. WHILE THE SAFETY BOARD IS PLEASED THAT WGL HAS INTENSIFIED TRAINING GIVEN TO ITS TRANSMISSION AND DISTRIBUTION DEPARTMENT EMPLOYEES, AN EQUALLY INTENSIVE EFFORT APPEARS NEEDED FOR ALL EMPLOYEES WHOSE RESPONSIBILITIES INVOLVE OPERATIONS WHEREIN A FAILURE TO UNDERSTAND OR TO FOLLOW REQUIRED SAFETY PROCEDURES MAY RESULT IN INJURIES OR DEATH TO EMPLOYEES OR THE PUBLIC.\n\nProbable Cause: None\n\nKeywords: Oversight, Training and Education\n\nNtsbnumber: DCA84MP001\n\nReport Number: PAR-84-03\n\nAddressee Name: Washington Gas\n\nAddressee Status: Closed - Acceptable Action\n\nAddressee Date Closed: 1990-06-18\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1985-01-11\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: WGL CO. LTR: DEPARTMENTAL ASSESSMENTS OF TRAINING ACTIVITIES INTENDED TO IDENTIFY IMPROVEMENTS NECESSARY TO ADEQUATELY PREPARE EMPLOYEES TO CARRY OUT SAFELY ALL ASSIGNED RESPONSIBILITIES ARE UNDERWAY. ANY DEFICIENCIES FOUND WILL BE CORRECTED. THE APPROPRIATENESS OF THE COMPANY'S POLICY WHICH MAKES EMPLOYEE TRAINING A DEPARTMENTAL RESPONSIBILITY RATHER THAN AN INTEGRATED COMPANY POLICY HAS BEEN EVALUATED.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1985-03-05\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: WGL LETTER DISCUSSES OFFICER-LEVEL COMMITTEE TO OVERSEE TRAINING ACTIVITIES.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1990-02-28\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1985-08-19\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1990-06-18\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1985-05-03\n\nCommunication Type: Official Correspondence","truncated":false,"body_characters":3792}