{"operation":"document","citation":"P-84-040","title":"NTSB Safety Recommendation P-84-040","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"1984-09-17","effective_on":"1984-09-17","summary":"THE NTSB RECOMMENDS THAT COLUMBIA GAS OF WEST VIRGINIA, INC., AND THE MOUNTAINEER GAS COMPANY: INSTRUCT ITS OPERATING PERSONNEL TO BE ALERT FOR AND TO REPORT IN THE COURSE OF THEIR NORMAL DUTIES, MISSING PIPELINE MARKERS, GROUND COVER OVER VALVE LOCATIONS, CONSTRUCTION ACTIVITIES NEAR ITS FACILITIES AND OTHER OCCURRENCES WHICH MIGHT ADVERSELY AFFECT PIPELINE OPERATIONS OR PIPELINE INTEGRITY.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-040.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-040.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-84-040","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-84-040","body":"NTSB safety recommendation P-84-040.\n\nTHE NTSB RECOMMENDS THAT COLUMBIA GAS OF WEST VIRGINIA, INC., AND THE MOUNTAINEER GAS COMPANY: INSTRUCT ITS OPERATING PERSONNEL TO BE ALERT FOR AND TO REPORT IN THE COURSE OF THEIR NORMAL DUTIES, MISSING PIPELINE MARKERS, GROUND COVER OVER VALVE LOCATIONS, CONSTRUCTION ACTIVITIES NEAR ITS FACILITIES AND OTHER OCCURRENCES WHICH MIGHT ADVERSELY AFFECT PIPELINE OPERATIONS OR PIPELINE INTEGRITY.\n\nPriority: CLASS II\n\nOverall Status: Closed - Acceptable Action\n\nIssued Date: 1984-09-17\n\nAdopted Date: 1984-09-17\n\nOverall Date Closed: 1989-03-21\n\nSynopsis: AT 11:15 A.M. E.D.T., ON OCTOBER 17, 1983, WHILE EXCAVATING FOR THE INSTALLATION OF A LARGE DIAMETER, CONCRETE, STORM DRAIN PIPE, A BACKHOE OPERATOR SNAGGED AND PUNCTURED A 3-INCH STEEL GAS LINE ON THE SOUTH SIDE OF STATE ROUTE 214, THEREBY FRACTURING A 3-INCH CAST IRON VALVE CONNECTING THE 3-INCH GAS LINE TO THE 4-INCH GAS LINE ON THE NORTH SIDE OF STATE ROUTE 214 IN SOUTH CHARLESTON, WEST VIRGINIA. GAS AT 45 PSIG BEGAN TO ESCAPE FROM BOTH BREAKS AND, WHILE IT SEEMED TO BE VENTING INTO THE ATMOSPHERE, IT WAS ALSO MIGRATING BELOW GROUND. THE CONTRACTOR IMMEDIATELY NOTI FIED COLUMBIA GAS OF WEST VIRGINIA INC., AND GAS COMPANY PERSONNEL WERE DISPATCHED TO THE SITE TO RESPOND TO THE EMERGENCY. AT 1:52 P.M., THE FOODLAND SUPERMARKET, LOCATED 35 FEET FROM THE FRACTURED VALVE, EXPLODED, AND THEN BURNED. EIGHTEEN PERSONS WHO WERE INSIDE THE STORE AND 1 GAS COMPANY EMPLOYEE WHO WAS OUTSIDE THE BUILDING WERE INJURED; THE SUPERMARKET AND AN ADJACENT COMMERCIAL BUILDING WERE DESTROYED.\n\nProbable Cause: None\n\nNtsbnumber: DCA84MP002\n\nReport Number: PAR-84-04\n\nAddressee Name: Mountaineer Gas Company\n\nAddressee Status: Closed - Acceptable Action\n\nAddressee Date Closed: 1995-08-17\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1989-01-12\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: ALL OF THE RECOMMENDATIONS WERE IMPLEMENTED PRIOR TO THE END OF 1985. ENCLOSED ARE EXCERPTS FROM MOUNTAINEER'S PROCEDURES AND OPERATIONS AND MAINTENANCE MANUAL WHICH MAKE REFERENCE TO THE SAFETY BOARD'S RECOMMENDATIONS. THE RECOMMENDATIONS CONCERNING DENOTING INACCESSIBLE GATE VALVES ON MAPS WAS THE LAST ONE COMPLETED DUE TO THE TIME INVOLVED REVIEWING EACH OPERATING MAP AND ASSOCIATED RECORDS. THE SAFETY BOARD'S RECOMMENDATION CONCERNING MISSING PIPELINE MARKERS WAS ALSO COMPLETED DURING 1985. PIPELINE MARKERS ARE CONTINUALLY BEING REPLACED AS THEY ARE REPORTED MISSING.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1989-03-21\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1988-10-21\n\nCommunication Type: Official Correspondence\n\nAddressee Name: NiSource, Inc. (formerly Columbia Gas)\n\nAddressee Status: Closed - Acceptable Action\n\nAddressee Date Closed: 1986-06-25\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1986-06-25\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: THE FIRST OBJECTIVE OF THE TRAINING PROGRAM DEVELOPED IN RESPONSE TO NTSB REC. P-84-37 IS \"TO PROVIDE AN INCREASED AWARENESS OF VARIOUS UNSAFE OR EMERGENCY TYPE SITUATIONS THAT COULD OCCUR.\" FURTHERMORE, PROCEDURES 652-1 (SECTION 4), 659-1 (SECTION 1), LOCATING GAS FACILITIES\" AND 659-3 (SECTION 5), \"DAMAGE PREVENTION PROGRAM\" REQUIRE EMPLOYEES TO BE ALERT FOR AND TO REPORT ITEMS SUCH AS MISSING PIPELINE MARKERS, CHANGES IN CRITICAL VALVE REFERENCE POINTS, AND OTHER PERTINENT INFORMATION.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1987-02-02\n\nCommunication Type: Official Correspondence","truncated":false,"body_characters":3664}