{"operation":"document","citation":"P-86-011","title":"NTSB Safety Recommendation P-86-011","source_type":"guidance","agency":"National Transportation Safety Board","status":"guidance","official":true,"published_on":"1986-04-17","effective_on":"1986-04-17","summary":"THE NTSB RECOMMENDS THAT THE CONTINENTAL PIPE LINE COMPANY: BASED UPON THE RESULTS OF THE JOB/TASK ANALYSIS, ESTABLISH INSPECTION AND WORK STANDARDS FOR PIPELINE RECOATING OPERATIONS AND CONDUCT PERIODIC QUALITY ASSURANCE REVIEWS TO MEASURE THE ADEQUACY OF THE LEVEL OF INSPECTION PROVIDED ON-SITE AT PIPELINE RECOATING PROJECTS.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-86-011.json","markdown":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-86-011.md"},"app_url":"https://regulus.evalyn.ai/document/ntsb-recommendation-p-86-011","source_url":"https://data.ntsb.gov/carol-main-public/sr-details/P-86-011","body":"NTSB safety recommendation P-86-011.\n\nTHE NTSB RECOMMENDS THAT THE CONTINENTAL PIPE LINE COMPANY: BASED UPON THE RESULTS OF THE JOB/TASK ANALYSIS, ESTABLISH INSPECTION AND WORK STANDARDS FOR PIPELINE RECOATING OPERATIONS AND CONDUCT PERIODIC QUALITY ASSURANCE REVIEWS TO MEASURE THE ADEQUACY OF THE LEVEL OF INSPECTION PROVIDED ON-SITE AT PIPELINE RECOATING PROJECTS.\n\nPriority: CLASS II\n\nOverall Status: Closed - Acceptable Action\n\nIssued Date: 1986-04-17\n\nAdopted Date: 1986-03-18\n\nOverall Date Closed: 1989-07-12\n\nSynopsis: ABOUT 10:30 A.M. ON JULY 23, 1985, IN A RURAL AREA ABOUT 8 MILES SOUTH OF KAYCEE, WYOMING, A GIRTH WELD CRACKED DURING A PIPELINE RECOATING PROJECT ON A 23-YEAR-OLD, 8-INCH DIAMETER PIPELINE OWNED BY THE CONTINENTAL PIPE LINE COMPANY. THE CRACKED GIRTH WELD ALLOWED THE RELEASE, ATOMIZATION, AND IGNITION OF AIRCRAFT TURBINE FUEL UNDER 430 POUNDS PRESSURE, KILLING ONE PERSON, BURNING SIX PERSONS, DESTROYING CONSTRUCTION EQUIPMENT, AND SHUTTING DOWN THE PIPELINE. DAMAGE WAS ESTIMATED AT MORE THAN $128,000.\n\nProbable Cause: None\n\nNtsbnumber: DCA85FP016\n\nReport Number: PAR-86-01\n\nAddressee Name: Continental Pipeline Company\n\nAddressee Status: Closed - Acceptable Action\n\nAddressee Date Closed: 1989-07-12\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1988-12-27\n\nCommunication Type: Official Correspondence\n\nCommunication Contents: BESIDES ASSIGNING AN INSPECTOR OR INSPECTORS TO PIPELINE MAINTENANCE AND/OR RECONDITIONING WORK, CHIEF INSPECTORS ARE ALSO ASSIGNED WHERE THE SCOPE OF THE PROJECT IS SIGNIFICANT ENOUGH TO WARRANT ONE.\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1988-11-08\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1989-07-12\n\nCommunication Type: Official Correspondence\n\nAddressee Organization Type: P-Private Industry\n\nCommunication Date: 1988-10-21\n\nCommunication Type: Official Correspondence","truncated":false,"body_characters":1964}