{"operation":"document","citation":"16 NYCRR 255.1009","title":"255.1009 Required report when compression couplings fail.","source_type":"regulation","agency":"New York State Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"Transmission and Distribution of Gas. (a) Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.\n\n(b) The ","machine_formats":{"json":"https://regulus.evalyn.ai/document/ny-nycrr-255-1009.json","markdown":"https://regulus.evalyn.ai/document/ny-nycrr-255-1009.md"},"app_url":"https://regulus.evalyn.ai/document/ny-nycrr-255-1009","source_url":"https://govt.westlaw.com/nycrr/Document/I7b0320d2a8d111e2a3b00000845b8d3e?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)","body":"(a) Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.\n\n(b) The mechanical fitting failure reporting requirements in subdivision (a) of this section do not apply to the following:\n\n(1) master meter operators;\n\n(2) small LPG operator as defined in section 255.1001 of this Part; or\n\n(3) LNG facilities.","truncated":false,"body_characters":597}