# 255.1009 Required report when compression couplings fail.

- **operation:** document
- **citation:** 16 NYCRR 255.1009
- **title:** 255.1009 Required report when compression couplings fail.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Transmission and Distribution of Gas. (a) Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.

(b) The 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-255-1009.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-255-1009.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-255-1009
- **source url:** https://govt.westlaw.com/nycrr/Document/I7b0320d2a8d111e2a3b00000845b8d3e?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

(a) Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.

(b) The mechanical fitting failure reporting requirements in subdivision (a) of this section do not apply to the following:

(1) master meter operators;

(2) small LPG operator as defined in section 255.1001 of this Part; or

(3) LNG facilities.
- **truncated:** false