{"operation":"document","citation":"16 NYCRR 255.221","title":"255.221 Scope.","source_type":"regulation","agency":"New York State Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"Transmission and Distribution of Gas. (a) Sections 255.225 through 255.245 of this Part prescribe minimum requirements for welding steel materials in pipelines.\n\n(b) These sections do not apply to welding that occurs during the manufacture of steel pipe or steel pipeline components.","machine_formats":{"json":"https://regulus.evalyn.ai/document/ny-nycrr-255-221.json","markdown":"https://regulus.evalyn.ai/document/ny-nycrr-255-221.md"},"app_url":"https://regulus.evalyn.ai/document/ny-nycrr-255-221","source_url":"https://govt.westlaw.com/nycrr/Document/I505cbde5cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)","body":"(a) Sections 255.225 through 255.245 of this Part prescribe minimum requirements for welding steel materials in pipelines.\n\n(b) These sections do not apply to welding that occurs during the manufacture of steel pipe or steel pipeline components.","truncated":false,"body_characters":245}