{"operation":"document","citation":"16 NYCRR 255.329","title":"255.329 Installation of plastic pipelines by trenchless excavation.","source_type":"regulation","agency":"New York State Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"Transmission and Distribution of Gas. Plastic pipelines installed by trenchless excavation must comply with the following:\n\n(a) Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installations.\n\n(b) For each pipeline section, plastic pipe and components that are pu","machine_formats":{"json":"https://regulus.evalyn.ai/document/ny-nycrr-255-329.json","markdown":"https://regulus.evalyn.ai/document/ny-nycrr-255-329.md"},"app_url":"https://regulus.evalyn.ai/document/ny-nycrr-255-329","source_url":"https://govt.westlaw.com/nycrr/Document/I501cf78b81c811ebae72af7b018ff3b4?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)","body":"Plastic pipelines installed by trenchless excavation must comply with the following:\n\n(a) Each operator must take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and/or structures at the time of installations.\n\n(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by section 255.3 of this Part, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.","truncated":false,"body_characters":542}