# 255.706 Transmission lines: leakage surveys.

- **operation:** document
- **citation:** 16 NYCRR 255.706
- **title:** 255.706 Transmission lines: leakage surveys.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Transmission and Distribution of Gas. (a) A leakage survey of each transmission line, and distribution main operating at 125 psig (862 kPa) or more in a Class 3 or 4 location, must be conducted at intervals not exceeding 15 months, but at least once each calendar year.

(b) Leaks located shall be investigated promptly, and necessary action shall be taken in accordance with sections 255.805 and 2
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-255-706.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-255-706.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-255-706
- **source url:** https://govt.westlaw.com/nycrr/Document/I505d5a44cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

(a) A leakage survey of each transmission line, and distribution main operating at 125 psig (862 kPa) or more in a Class 3 or 4 location, must be conducted at intervals not exceeding 15 months, but at least once each calendar year.

(b) Leaks located shall be investigated promptly, and necessary action shall be taken in accordance with sections 255.805 and 255.807 of this Part.
- **truncated:** false
- **body characters:** 380
