# 256.13 Holder connections and piping.

- **operation:** document
- **citation:** 16 NYCRR 256.13
- **title:** 256.13 Holder connections and piping.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Inspection and Maintenance of Gas Holders. Valves for connections to holders including relief valves for pressure tanks shall be inspected and tested for opening, closing and leakage at least twice a year. All necessary adjustments and repairs shall be made to restore each item to a high operating efficiency. Gate valves on inlet and outlet connections shall be tested for free movement, and inspectio
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-256-13.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-256-13.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-256-13
- **source url:** https://govt.westlaw.com/nycrr/Document/I505df671cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

Valves for connections to holders including relief valves for pressure tanks shall be inspected and tested for opening, closing and leakage at least twice a year. All necessary adjustments and repairs shall be made to restore each item to a high operating efficiency. Gate valves on inlet and outlet connections shall be tested for free movement, and inspection for lubrication of stems and condition of packing at least once a week. Where practicable, control valves shall be provided on inlet and outlet connections at a point distant from the holder, and inlet, outlet and by-pass valves shall be motorized. All piping in proximity to holders shall where practicable be placed underground.
- **truncated:** false
- **body characters:** 692
