# 261.15 Operation and maintenance plan.

- **operation:** document
- **citation:** 16 NYCRR 261.15
- **title:** 261.15 Operation and maintenance plan.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Piping Beyond the Meter (Natural Gas). (a) Each operator shall establish and file with the Albany office of the Gas Division of the New York State Department of Public Service a detailed written operating and maintenance plan for complying with all the provisions of this Part. This operating and maintenance plan shall include, as a minimum, procedures required to comply with the provisions of the
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-261-15.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-261-15.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-261-15
- **source url:** https://govt.westlaw.com/nycrr/Document/I505e44accd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

(a) Each operator shall establish and file with the Albany office of the Gas Division of the New York State Department of Public Service a detailed written operating and maintenance plan for complying with all the provisions of this Part. This operating and maintenance plan shall include, as a minimum, procedures required to comply with the provisions of the leakage survey, carbon monoxide, and warning tag sections of this Part.

(b) Revisions to these written procedures shall be submitted to the Gas Division at least 30 days prior to the effective date thereof.

(c) The procedures shall include but not be limited to the requirements of this Part and shall be designed to make customers aware of hazardous conditions relating to their gas appliances and piping installations.
- **truncated:** false
- **body characters:** 783
