# 261.19 High-pressure piping.

- **operation:** document
- **citation:** 16 NYCRR 261.19
- **title:** 261.19 High-pressure piping.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Piping Beyond the Meter (Natural Gas). As part of the procedures developed in compliance with section 261.15 of this Part, the operator's plan must provide for annual notification to the customer and owner that:

(a) they receive gas in excess of 14 inches water column;

(b) their piping system, including pressure reducing equipment, must meet the requirements of NFPA 54;

(c) they must contact t
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-261-19.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-261-19.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-261-19
- **source url:** https://govt.westlaw.com/nycrr/Document/I505e44b2cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

As part of the procedures developed in compliance with section 261.15 of this Part, the operator's plan must provide for annual notification to the customer and owner that:

(a) they receive gas in excess of 14 inches water column;

(b) their piping system, including pressure reducing equipment, must meet the requirements of NFPA 54;

(c) they must contact the operator for a safety review whenever a change in piping or appliances is planned; and

(d) an inspection of their regulators by qualified individuals should be conducted.
- **truncated:** false
- **body characters:** 534
