# 753-4.13 Support and backfilling requirements.

- **operation:** document
- **citation:** 16 NYCRR 753-4.13
- **title:** 753-4.13 Support and backfilling requirements.
- **source type:** regulation
- **agency:** New York State Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Protection of Underground Facilities. Where an underground facility will be disturbed or uncovered by excavation or demolition, the operator of such facility shall indicate to the excavator any preferred means of support or protection required for such facility and any special backfilling requirements or provide any other guidance for protection of an underground facility. Such information shall
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ny-nycrr-753-4-13.json
- **markdown:** https://regulus.evalyn.ai/document/ny-nycrr-753-4-13.md
- **app url:** https://regulus.evalyn.ai/document/ny-nycrr-753-4-13
- **source url:** https://govt.westlaw.com/nycrr/Document/I5069b63ecd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)
**body:**

Where an underground facility will be disturbed or uncovered by excavation or demolition, the operator of such facility shall indicate to the excavator any preferred means of support or protection required for such facility and any special backfilling requirements or provide any other guidance for protection of an underground facility. Such information shall be furnished to the excavator before the stated date of commencement of the work, if practical.
- **truncated:** false
- **body characters:** 456
