# 2025 Gas Distribution IA Question Set

- **operation:** document
- **citation:** PHMSA GD.2025.01
- **title:** 2025 Gas Distribution IA Question Set
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2024-12-19
- **effective on:** 2024-12-19
- **summary:** PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025 Assessment and Repair - Integrity Assessment Via Pressure Test 1. Test Acceptance Criteria and Procedures Were test acceptance criteria and procedures/processes sufficient to
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-2025-gas-distribution-ia-question-set.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-2025-gas-distribution-ia-question-set.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-2025-gas-distribution-ia-question-set
- **source url:** https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-fed.2025.01
**body:**

<<<PAGE 1>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
Assessment and Repair - Integrity Assessment Via Pressure Test
1. Test Acceptance Criteria and Procedures Were test acceptance criteria and procedures/processes sufficient to
assure the basis for an acceptable pressure test? (AR.PTI.PRESSTESTACCEP.P) 192.503(a)
(192.503(b);192.503(c);192.503(d);192.503(e);192.505(a);192.505(b);192.505(c);192.505(d);192.507(a);192.507(b);192.507(
c);192.513(a);192.513(b);192.513(c);192.513(d))
Assessment and Repair - Repair Criteria (O and M)
1. Repair of Corroded Pipe Does the process give sufficient guidance for personnel to repair or replace pipe that has
corroded to an extent that there is no longer sufficient remaining strength in the pipe wall? (AR.RCOM.REPAIR.P) 192.605(b)(2)
(192.487(a);192.487(b);192.489(a);192.489(b);192.491(c))
2. Repair of Corroded Pipe Do records document the repair or replacement of pipe that has been internally corroded to
an extent that there is not sufficient remaining strength in the pipe wall? (AR.RCOM.REPAIR.R) 192.491(c) (192.487;192.489)
3. Field Inspection - Remedial Actions (OM) Is anomaly remediation and documentation of remediation adequate
for all segments? (AR.RCOM.REMEDIATIONOM.O) 192.487(a) (192.487(b);192.489)
4. Plastic Leak Repair - Mechanical Clamps Does the operator’s process ensure that mechanical leak clamps are
not used as a permanent repair method for plastic pipe? (AR.RCOM.PLASTICLEAKCLAMP.P) 192.720
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
5. Plastic Leak Repair - Mechanical Clamps Do records indicate that mechanical leak clamp repairs for plastic pipe
are documented with date installed, location, and date of removal? (AR.RCOM.PLASTICLEAKCLAMP.R) 192.720
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
6. Plastic Leak Repair - Mechanical Clamps Do field observations verify that mechanical leak clamp repairs for
plastic pipe were installed and documented properly? (AR.RCOM.PLASTICLEAKCLAMP.O) 192.720 (192.605;192.603)
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
GD.2025.01 Page 1 of 85

<<<PAGE 2>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
Assessment and Repair - Repair Methods and Practices
1. Safety While Making Repairs Does the process ensure that repairs are made in a safe manner and are made so as
to prevent damage to persons and property? (AR.RMP.SAFETY.P) 192.605(b)(9) (192.713(b))
2. Prevention of Accidental Ignition Perform observations of selected locations to verify that adequate steps have
been taken by the operator to minimize the potential for accidental ignition. (AR.RMP.IGNITION.O) 192.751(a)
(192.751(b);192.751(c))
3. Tapping Pipelines Under Pressure Is the process adequate for tapping pipelines under pressure?
(AR.RMP.HOTTAP.P) 192.605(b)(1) (192.627)
4. Test Reinstated Service Lines Is the process adequate for the testing of disconnected service lines?
(AR.RMP.TESTREINSTATE.P) 192.605(b) (192.725(a);192.725(b))
5. Test Reinstated Service Lines From the review of records, did the operator properly test disconnected service lines?
(AR.RMP.TESTREINSTATE.R) 192.603(b) (192.725(a);192.725(b))
CRM, SCADA, and Leak Detection - General
1. Control Room Management Criteria Do procedures adequately address the process and criteria to determine
which facilities are control rooms? (CR.CRMGEN.CRMCRITERIA.P) 192.631(a)(2)
2. Control Room Management Are CRM procedures formalized and controlled? (CR.CRMGEN.CRMMGMT.P)
192.631(a)(2)
3. Control Room Management Were procedures approved, in place, and implemented on or before the regulatory
deadline? (CR.CRMGEN.CRMIMPLEMENT.R) 192.631(a)(2)
GD.2025.01 Page 2 of 85

<<<PAGE 3>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
4. Control Room Management Are procedures readily available to controllers in the control room?
(CR.CRMGEN.CRMPROCLOCATION.O) 192.631(a)(2)
CRM, SCADA, and Leak Detection - Roles and Responsibilities
1. Roles and Responsibilities Are there clear processes to describe each controller's physical domain of responsibility
for pipelines and other facility assets? (CR.CRMRR.RESPONSIBLE.P) 192.631(b)
2. Roles and Responsibilities Are there provisions in place to assure that only qualified individuals may assume control
at any console/desk? (CR.CRMRR.QUALCONTROL.P) 192.631(b)
3. Roles and Responsibilities If the physical domain of responsibility periodically changes, has a clear process been
established to describe the conditions for when such a change occurs? (CR.CRMRR.DOMAINCHANGE.P) 192.631(b)
4. Controller Authority (Abnormal Operations) Have processes been established to define the controllers'
authority and responsibilities when an abnormal operating condition is detected? (CR.CRMRR.AUTHORITYABNORMAL.P)
192.631(b)(2)
5. Roles and Responsibilities Do processes address a controller's role during temporary impromptu (unplanned)
changes in controller responsibilities? (CR.CRMRR.RESPCHANGE.P) 192.631(b)
6. Roles and Responsibilities Do the defined roles and responsibilities require controllers to stay at the console to verify
all SCADA commands that have been initiated are fulfilled, and that commands given via verbal communications are acknowledged
before leaving the console for any reason? (CR.CRMRR.COMMANDVERIFY.P) 192.631(b)
7. Overpressure Limits Are controllers aware of the current MAOPs of all pipeline segments for which they are
responsible, and have they been assigned the responsibility to maintain those pipelines at or below the MAOP?
(CR.CRMRR.PRESSLIMITS.O) 192.631(b)(2) (192.619(a);192.631(e)(1))
GD.2025.01 Page 3 of 85

<<<PAGE 4>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
8. Controller Authority (Emergency Operations) Do processes define the controllers' authority and responsibility
to make decisions, take actions, and communicate with others upon being notified of, or upon detection of, and during, an
emergency or if a leak or rupture is suspected? (CR.CRMRR.AUTHORITYEMERGENCY.P) 192.631(b)(3) (192.615(a)(8);NTSB P-11-
9)
9. Control Center Evacuation Do processes specifically address the controller's responsibilities in the event the control
room must be evacuated? (CR.CRMRR.EVACUATION.P) 192.631(b)(3)
10. Communication Failure Do processes specifically address the controller's responsibilities in the event of a SCADA
system or data communications system failure impacting large sections of the controller's domain of responsibility?
(CR.CRMRR.COMMSYSFAIL.P) 192.631(b)(3)
11. Shift Change Process Have processes been established for the hand-over of responsibility that specify the type of
information to be communicated to the oncoming shift? (CR.CRMRR.HANDOVER.P) 192.631(b)(4) (192.631(c)(5))
12. Shift Change Process Do observations indicate adequate hand-over of responsibility to the oncoming shift?
(CR.CRMRR.HANDOVER.O) 192.631(b)(4) (192.631(c)(5))
13. Shift Change Process - Documentation Do processes require that records document the hand-over of
responsibility, document the time the actual hand-over of responsibility occurs, and the key information and topics that were
communicated during the hand-over? (CR.CRMRR.HANDOVERDOC.P) 192.631(b)(4) (192.631(c)(5))
14. Shift Change Process - Documentation Are there records that document the hand-over of responsibility,
document the time the actual hand-over of responsibility occurs, and the key information and topics that were communicated
during the hand-over? (CR.CRMRR.HANDOVERDOC.R) 192.631(b)(4) (192.631(c)(5))
15. Shift Change Process - Overlap Do processes require the controllers to discuss recent and impending important
activities ensuring adequate overlap? (CR.CRMRR.HANDOVEROVERLAP.P) 192.631(b)(4)
16. Shift Change Process - Handover Alternative When a controller is unable to continue or assume
responsibility for any reason, do the shift hand-over processes include alternative shift hand-over actions that specifically address
this situation? (CR.CRMRR.HANDOVERALTERNATIVE.P) 192.631(b)(4)
GD.2025.01 Page 4 of 85

<<<PAGE 5>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
17. Shift Change Process - Unattended Consoles Has the operator established an adequate process for
occasions when the console is left temporarily unattended for any reason? (CR.CRMRR.UNATTENDCONSOLE.P) 192.631(b)(4)
18. Shift Change Process - Console Coverage Do processes maintain adequate console coverage during shift
hand-over? (CR.CRMRR.CONSOLECOVERAGE.P) 192.631(b)(4)
19. Authority to Supersede Controller Action Disallowed - Controllers Do processes disallow others to
have authority to direct or supersede the specific technical actions of a controller? (CR.CRMRR.OTHERAUTHORITYDISALLOW.P)
192.631(b)(5)
20. Authority to Supersede Controller Action Disallowed - Controllers Do records indicate that the
policy disallowing others to have authority to direct or supersede the specific technical actions of a controller has been
communicated to controllers and others? (CR.CRMRR.OTHERAUTHORITYDISALLOW.R) 192.631(b)(5)
21. Authority to Supersede Controller Action Disallowed - Controllers Are controllers aware of, and can
reference, processes that disallow others to have authority to direct or supersede the specific technical actions of a controller?
(CR.CRMRR.OTHERAUTHORITYDISALLOW.O) 192.631(b)(5)
22. Others with Authority Qualification - Controllers Does the process result in identification of required
qualification elements for those authorized to direct or supersede the technical actions of a controller that are sufficient for those
individuals to understand the implications of the scope of potential actions? (CR.CRMRR.OTHERAUTHORITYQUAL.P) 192.631(b)(5)
23. Others with Authority Qualification - Controllers Do records indicate that others given authority to direct
or supersede the specific technical actions of a controller were qualified? (CR.CRMRR.OTHERAUTHORITYQUAL.R) 192.631(b)(5)
24. Others with Authority Implementation - Controllers Is the process defined with respect to the details of
how those authorized to direct or supersede the technical actions of a controller are to implement their authority?
(CR.CRMRR.OTHERAUTHORITYIMPLEMENT.P) 192.631(b)(5)
25. Others with Authority List - Controllers Is a list of individuals with authority to direct or supersede the
technical actions of a controller readily available to controllers? (CR.CRMRR.OTHERAUTHORITYLIST.R) 192.631(b)(5)
GD.2025.01 Page 5 of 85

<<<PAGE 6>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
26. Others with Authority Implementation - Controllers Do records adequately document occurrences of
when others authorized to direct or supersede the technical actions of a controller have done so?
(CR.CRMRR.OTHERAUTHORITYIMPLEMENT.R) 192.631(b)(5)
27. Others with Authority Implementation - Controllers Do others authorized to direct or supersede the
technical actions of a controller demonstrate an understanding of the process to implement this authority?
(CR.CRMRR.OTHERAUTHORITYIMPLEMENT.O) 192.631(b)(5)
CRM, SCADA, and Leak Detection - Supervisory Control and Data
Acquisition
1. Adequate Information (API 1165 Compliance) Do processes clearly define the types of changes to the
SCADA system(s) that constitute additions, expansions, or replacements under the meaning of the CRM rule?
(CR.SCADA.SYSTEMMOC.P) 192.631(c)(1)
2. SCADA Displays Are there written processes to implement the API RP 1165 (1st Edition) display standards to the SCADA
systems that have been added, expanded, or replaced since August 1, 2012? (CR.SCADA.DISPLAYCONFIG.P) 192.631(c)(1)
3. SCADA API RP 1165 Human Factors Has section 4 of API RP 1165 (1st Edition) regarding human factors
engineering been implemented? (CR.SCADA.1165HUMANFACTORS.O) 192.631(c)(1)
4. SCADA Display Objects Has section 8 of API RP 1165 (1st Edition) regarding display object characteristics been
implemented? (CR.SCADA.DISPLAYOBJECTS.O) 192.631(c)(1)
5. SCADA Display Dynamics Has Section 9 of API RP 1165 (1st Edition) regarding display object dynamics been
implemented? (CR.SCADA.DISPLAYDYNAMICS.R) 192.631(c)(1)
6. SCADA Administration Have applicable paragraphs of section 11 of API RP 1165 (1st Edition) administration been
implemented? (CR.SCADA.ADMINISTRATION.R) 192.631(c)(1)
GD.2025.01 Page 6 of 85

<<<PAGE 7>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
7. SCADA Impracticality If any/all applicable paragraph(s) of API RP 1165 (1st Edition) have not been implemented, has
it been demonstrated and documented that the unimplemented provisions are impractical for the SCADA system used?
(CR.SCADA.1165IMPRACTICAL.R) 192.631(c)(1)
8. Set Points Does the process adequately define safety-related points? (CR.SCADA.SETPOINT.P) 192.631(c)(2)
9. Set Points Do records indicate safety-related points have been adequately implemented? (CR.SCADA.SETPOINT.R)
192.631(c)(2)
10. Point-to-Point Verification Are there adequate processes to define and identify the circumstances which require a
point-to-point verification? (CR.SCADA.POINTVERIFY.P) 192.631(c)(2)
11. Point-to-Point Verification Have required point-to-point verifications been performed? (CR.SCADA.POINTVERIFY.R)
192.631(c)(2)
12. Point-to-Point Verification Extent Are there adequate processes for the thoroughness of the point-to-point
verification? (CR.SCADA.POINTVERIFYEXTENT.P) 192.631(c)(2)
13. Point-to-Point Verification Extent Do records demonstrate adequate thoroughness of the point-to-point
verification? (CR.SCADA.POINTVERIFYEXTENT.R) 192.631(c)(2)
14. Point-to-Point Verification Interval Is there an adequate process for defining when the point-to-point
verification must be completed? (CR.SCADA.POINTVERFIYINTVL.P) 192.631(c)(2)
15. Point-to-Point Verification Interval Do records indicate the point-to-point verification has been completed at
the required intervals? (CR.SCADA.POINTVERFIYINTVL.R) 192.631(c)(2)
GD.2025.01 Page 7 of 85

<<<PAGE 8>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
16. Point-to-Point Verification Are point-to-point verifications performed adequately when required?
(CR.SCADA.POINTVERIFY.O) 192.631(c)(2)
17. Internal Communication Plan Has an internal communication plan been established and implemented that is
adequate to manually operate the pipeline during a SCADA failure/outage? (CR.SCADA.COMMPLAN.P) 192.631(c)(3)
18. Internal Communication Plan Has the internal communication plan been tested and verified for manual operation
of the pipeline safely at least once each calendar year but at intervals not exceeding 15 months? (CR.SCADA.COMMPLAN.R)
192.631(c)(3)
19. Backup SCADA System Is there a backup SCADA system? (CR.SCADA.BACKUPSCADA.O) 192.631(c)
20. Backup SCADA Development Has the use of the backup SCADA system for development work been defined?
(CR.SCADA.BACKUPSCADADEV.P) 192.631(c)(4)
21. Backup SCADA Testing Is the backup SCADA system required to be tested at least once each calendar year at
intervals not to exceed 15 months? (CR.SCADA.BACKUPSCADATEST.P) 192.631(c)(4)
22. Backup SCADA Testing Is the backup SCADA system tested at least once each calendar year at intervals not to
exceed 15 months? (CR.SCADA.BACKUPSCADATEST.R) 192.631(c)(4)
23. Backup SCADA Verification Is testing required to verify adequate processes are in place for decision-making and
internal communications to successfully implement a transition from primary SCADA to backup SCADA, and back to primary
SCADA? (CR.SCADA.BACKUPSCADAVERIFY.P) 192.631(c)(4)
24. Backup SCADA Verification Does the testing verify that there are adequate processes in place for decision-making
and internal communications to successfully implement a transition from primary SCADA to backup SCADA, and back to primary
SCADA? (CR.SCADA.BACKUPSCADAVERIFY.R) 192.631(c)(4)
GD.2025.01 Page 8 of 85

<<<PAGE 9>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
25. Backup SCADA Adequacy If the back-up SCADA system is not designed to handle all the functionality of the main
SCADA system, does the testing determine whether there are adequate procedures in place to account for displaced and/or
different available functions during back-up operations? (CR.SCADA.BACKUPSCADAADEQUACY.R) 192.631(c)(4)
26. Backup SCADA Transfer Do processes adequately address and test the logistics of transferring control to a backup
control room? (CR.SCADA.BACKUPSCADATRANSFER.P) 192.631(c)(4)
27. Backup SCADA Return to Primary Do procedures adequately address and test the logistics of returning
operations back to the primary control room? (CR.SCADA.BACKUPSCADARETURN.P) 192.631(c)(4)
28. Backup SCADA Testing Is a representative sampling of critical functions in the back-up SCADA system being tested
to ensure proper operation in the event the backup system is needed? (CR.SCADA.BACKUPSCADAFUNCTIONS.R) 192.631(c)(4)
CRM, SCADA, and Leak Detection - Fatigue Management
1. Fatigue Mitigation Does the fatigue mitigation process or procedures (plan) identify operator-specific fatigue risks?
(CR.CRMFM.FATIGUEMITIGATION.P) 192.631(d) (192.631(a))
2. Fatigue Risk Reduction Does the fatigue mitigation plan adequately address how the program reduces the risk
associated with controller fatigue? (CR.CRMFM.FATIGUERISKS.P) 192.631(d) (192.631(a))
3. Fatigue Quantification Do processes require that the potential contribution of controller fatigue to incidents and
accidents be quantified during investigations? (CR.CRMFM.FATIGUEQUANTIFY.P) 192.631(d) (192.631(a);192.631(g)(1))
4. Fatigue Mitigation Manager Is there a designated fatigue risk manager who is responsible and accountable for
managing fatigue risk and fatigue countermeasures, and someone (perhaps the same person) that is authorized to review and
approve HOS emergency deviations? (CR.CRMFM.FATIGUEMANAGER.P) 192.631(d) (192.631(a))
GD.2025.01 Page 9 of 85

<<<PAGE 10>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
5. Scheduled Shift Length Is the scheduled shift length less than or equal to 12 hours (not including shift hand-over) or
is there a documented technical basis to show that shift lengths and schedule rotations are adequate to provide controllers off-
duty time sufficient to achieve 8 hours of continuous sleep? (CR.CRMFM.SHIFTLENGTH.R) 192.631(d)(1) (192.631(a))
6. Establishing Shift Length Does the operator factor in all time the individual is working for the company when
establishing shift lengths and schedule rotations and that periods of time off that accommodates commute time or is there a
documented technical basis to show that shift lengths and schedule rotations are adequate to provide controllers off-duty time
sufficient to achieve 8 hours of continuous sleep? (CR.CRMFM.SHIFTLENGTHTIME.R) 192.631(d)(1)
7. Scheduled Time Off Between Shifts Are all scheduled periods of time off at least one hour longer than 8 hours
plus commute time or is there a documented technical basis to show that shift lengths and schedule rotations are adequate to
provide controllers off-duty time sufficient to achieve 8 hours of continuous sleep? (CR.CRMFM.SCHEDULEDTIMEOFF.R)
192.631(d)(1)
8. On Call Controllers For controllers who are on call, do processes minimize interrupting the required 8 hours of
continuous sleep or require a documented technical basis to show that shift lengths and schedule rotations are adequate to
provide controllers off-duty time sufficient to achieve 8 hours of continuous sleep? (CR.CRMFM.ONCALLCONTROLLER.P)
192.631(d) (192.631(a))
9. On Call Controllers Do records for controllers on call, provide records shift schedule, when calls were made for on call
and how long the individual worked? (CR.CRMFM.ONCALLCONTROLLER.R) 192.631(d)(1)
10. Maximum Hours of Service Do processes limit the maximum HOS limit in any sliding 7-day period to no more than
65 hours or is there a documented technical basis to show a reduction of the risk associated with controller fatigue?
(CR.CRMFM.MAXHOS.P) 192.631(d)(4)
11. Documented Time Schedule Is there a formal system to document all scheduled and unscheduled HOS worked,
including overtime and time spent performing duties other than control room duties? (CR.CRMFM.DOCSCHEDULE.P) 192.631(d)(4)
(192.631(a))
12. Time Off Following Successive Days Worked For normal business hour type operations (i.e., five days per
week), are no more than five days worked in succession before at least two days off? (CR.CRMFM.DAYSOFF.P) 192.631(d)(4)
(192.631(a))
GD.2025.01 Page 10 of 85

<<<PAGE 11>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
13. Day Only Work Hours For normal business hour type operations (i.e., five days per week), do records indicate shift
start times no earlier than 6:00 a.m. and shift end times no later than 7:00 p.m.? (CR.CRMFM.WORKHOURS.R) 192.631(d)(4)
14. Number of Qualified Controllers Do operations include a sufficient number of qualified controllers?
(CR.CRMFM.CONTROLLERNUMBERS.O) 192.631(d)
15. Off Duty Hours When Limits Reached Do processes ensure that controllers are provided with at least thirty-five
(35) continuous off-duty hours when limits are reached following the most recent 35-hour (minimum) off-duty rest period or is
there a documented technical basis to show that the maximum limit on controller HOS is adequate to reduce the risk associated
with controller fatigue? (CR.CRMFM.OFFDUTYHOURS.P) 192.631(d)(4)
16. Shift Holdover Does the daily HOS limit and shift holdover process conform to shift HOS and holdover guidelines or is
there a documented technical basis to show that the maximum limit on controller HOS is adequate to reduce the risk associated
with controller fatigue? (CR.CRMFM.SHIFTHOLDOVER.P) 192.631(d)(4) (192.631(a))
17. Specific Fatigue Countermeasures During Times of Heightened Risk Do processes require specific
fatigue countermeasures during applicable time periods, or is there a documented technical basis to show that the maximum limit
on controller HOS is adequate to reduce the risk associated with controller fatigue? (CR.CRMFM.SPECIFICCOUNTERMEASURES.P)
192.631(d)(4) (192.631(a))
18. Deviations from HOS Limits Is there a formal process for approving deviations from the maximum HOS limits?
(CR.CRMFM.HOSDEVIATIONS.P) 192.631(d)(4) (192.631(a))
19. Fatigue Education Does the program require that fatigue education/training is required for all controllers and control
room supervisors? (CR.CRMFM.FATIGUEEDUCATE.P) 192.631(d)(2) (192.631(d)(3);192.631(a))
20. Review of Fatigue Education/Training Program Effectiveness Do processes require that the
effectiveness of the fatigue education/training program be reviewed at least once each calendar year, not to exceed 15 months?
(CR.CRMFM.FATIGUEREVIEW.P) 192.631(d)(2) (192.631(d)(3);192.605(a))
GD.2025.01 Page 11 of 85

<<<PAGE 12>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
21. Fatigue Mitigation Strategies Does fatigue education address fatigue mitigation strategies (countermeasures),
how off-duty activities contribute to fatigue and recognizing the effects of fatigue? (CR.CRMFM.FATIGUESTRATEGY.P)
192.631(d)(2) (192.631(a))
22. Fatigue Education Is fatigue education/training documented for all controllers and control room supervisors?
(CR.CRMFM.FATIGUEEDUCATE.R) 192.631(d)(2) (192.631(d)(3))
23. Fatigue Training Content Is the content of fatigue training adequate for training controllers and supervisors to
recognize the effects of fatigue? (CR.CRMFM.FATIGUECONTENT.P) 192.631(d)(3)
24. Fatigue Training Content Has controller and supervisor training to recognize the effects of fatigue been
documented? (CR.CRMFM.FATIGUECONTENT.R) 192.631(d)(3)
CRM, SCADA, and Leak Detection - Alarm Management
1. Alarm Procedures Is the alarm management plan a formal process that specifically identifies critical topical areas
included in the program? (CR.CRMAM.ALARM.P) 192.631(e)
2. Alarm Malfunction Is there a process to identify and correct inaccurate or malfunctioning alarms?
(CR.CRMAM.ALARMMALFUNCTION.P) 192.631(e)(1)
3. Alarm Review Does the review of safety-related alarms account for different alarm designs and all alarm types/priorities?
(CR.CRMAM.ALARMREVIEW.P) 192.631(e)(1)
4. Controller SCADA Performance Does the review of safety-related alarms account for console differences that could
affect individual-specific controller qualification and performance? (CR.CRMAM.CONTROLLERPERFORMANCE.P) 192.631(h)
(192.631(e)(1))
GD.2025.01 Page 12 of 85

<<<PAGE 13>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
5. Managing Stale or Unreliable Data Does the review of safety-related alarms include specific procedures and
practices for managing stale or unreliable data? (CR.CRMAM.STALEDATA.P) 192.631(e)(1)
6. Monthly Analysis of SCADA Data Do processes require the monthly identification, recording, review, and analysis
of points that have been taken off scan, have had alarms inhibited, generated false alarms, or that have had forced or manual
values for periods of time exceeding that required for associated maintenance or operating activities?
(CR.CRMAM.MONTHLYANALYSIS.P) 192.631(e)(2)
7. Correction of SCADA Problems Does the alarm management plan include a process for promptly correcting
identified problems and for returning these points to service? (CR.CRMAM.PROBLEMCORRECTION.P) 192.631(e)(2)
8. Alarm Point Verification Do records verify that monthly reviews and analysis of alarm points have been performed?
(CR.CRMAM.ALARMVERIFY.R) 192.631(e)(2)
9. Alarm Setpoint Process Is there a formal process to determine the correct alarm setpoint values and alarm
descriptions? (CR.CRMAM.ALARMSETPOINTS.P) 192.631(e)(3)
10. Controls on SCADA Settings Have procedures been established to clearly address how and to what degree
controllers can change alarm limits or setpoints, or inhibit alarms, or take points off-scan? (CR.CRMAM.SETTINGCONTROL.P)
192.631(e)(3)
11. Alarm Value Verification Do records demonstrate verification of correct safety-related alarm set-point values and
alarm descriptors when associated field instruments are calibrated or changed and at least once each calendar year, but at
intervals not to exceed 15 months? (CR.CRMAM.ALARMVALUEVERIFY.R) 192.631(e)(3)
12. Alarm Management Plan Review Are there processes to review the alarm management plan at least once each
calendar year, but at intervals not exceeding 15 months, in order to determine the effectiveness of the plan?
(CR.CRMAM.PLANREVIEW.P) 192.631(e)(4)
13. Alarm Management Plan Review Do records indicate review of the alarm management plan at least once each
calendar year, but at intervals not exceeding 15 months, in order to determine the effectiveness of the plan?
(CR.CRMAM.PLANREVIEW.R) 192.631(e)(4)
GD.2025.01 Page 13 of 85

<<<PAGE 14>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
14. Measuring Work Load Does the CRM program have a means of identifying and measuring the work load (content and
volume of general activity) being directed to an individual controller? (CR.CRMAM.WORKLOAD.P) 192.631(e)(5)
15. Monitoring Work Load Is the process of monitoring and analyzing general activity comprehensive?
(CR.CRMAM.WORKLOADMONITORING.P) 192.631(e)(5)
16. Controller Reaction to Incoming Alarms Does the process have a means of determining that the controller has
sufficient time to analyze and react to incoming alarms? (CR.CRMAM.CONTROLLERREACTION.P) 192.631(e)(5)
17. Analysis of Controller Performance Has an analysis been performed to determine if controller(s) performance is
currently adequate? (CR.CRMAM.PERFORMANCEANALYSIS.R) 192.631(e)(5)
18. Alarm Deficiency Resolution Is there a process to address how deficiencies found in implementing 192.631(e)(1)
through 192.631(e)(5) will be resolved? (CR.CRMAM.DEFICIENCIES.P) 192.631(e)(6)
19. Alarm Management Deficiencies Do records indicate deficiencies found in implementing 192.631(e)(1) through
192.631(e)(5) have been resolved? (CR.CRMAM.DEFICIENCIES.R) 192.631(e)(6)
CRM, SCADA, and Leak Detection - Change Management
1. Field Equipment Changes Is there a process to assure changes in field equipment that could affect control room
operations are coordinated with the control room personnel? (CR.CRMCMGT.EQUIPMENTCHANGES.P) 192.631(f)(1)
2. Controller Participation in System Changes Are control room representative(s) required to participate in
meetings where changes that could directly or indirectly affect the hydraulic performance or configuration of the pipeline (including
routine maintenance and repairs) are being considered, designed and implemented? (CR.CRMCMGT.CONTROLLERPARTICIPATE.P)
192.631(f)(1) (192.631(f)(3))
GD.2025.01 Page 14 of 85

<<<PAGE 15>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
3. Controller Participation in System Changes Do records indicate that control room representative(s) participate
in meetings where changes that could directly or indirectly affect the hydraulic performance or configuration of the pipeline
(including routine maintenance and repairs) are being considered, designed and implemented?
(CR.CRMCMGT.CONTROLLERPARTICIPATE.R) 192.631(f)(1) (192.631(f)(3))
4. Emergency Contact with Control Room Is there a process requiring field personnel and SCADA support
personnel to contact the control room when emergency conditions exist? (CR.CRMCMGT.EMERGENCYCONTACT.P) 192.631(f)(2)
5. Coordination of Field Changes Does the process require field personnel and SCADA support personnel to contact
the control room when making field changes (for example, moving a valve) that affect control room operations?
(CR.CRMCMGT.FIELDCONTACT.P) 192.631(f)(2)
6. Coordination of Field Changes Do records indicate field personnel and SCADA support personnel contacted the
control room when making field changes (for example, moving a valve) that affect control room operations?
(CR.CRMCMGT.FIELDCHANGES.R) 192.631(f)(2)
CRM, SCADA, and Leak Detection - Operating Experience
1. Reportable Incident (Review) Is there a formal, structured approach for reviewing and critiquing reportable events
to identify lessons learned? (CR.CRMEXP.REPORTABLEINCIDENTREVIEW.P) 192.631(g)(1)
2. Reportable Incident (Review) Do records indicate reviews of reportable events specifically analyzed all contributing
factors to determine if control room actions contributed to the event, and corrected any deficiencies?
(CR.CRMEXP.REPORTABLEINCIDENTREVIEW.R) 192.631(g)(1)
3. Lessons Learned Does the program require training on lessons learned from a broad range of events (reportable
incidents/accidents, near misses, leaks, operational and maintenance errors, etc.), even though the control room may not have
been at fault? (CR.CRMEXP.LESSONSLEARNED.P) 192.631(g)(2) (192.631(b)(5))
GD.2025.01 Page 15 of 85

<<<PAGE 16>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
4. Lessons Learned Has operating experience review training been conducted on lessons learned from a broad range of
events (reportable incidents/accidents, near misses, leaks, operational and maintenance errors, etc.)?
(CR.CRMEXP.LESSONSLEARNED.R) 192.631(g)(2) (192.631(b)(5))
CRM, SCADA, and Leak Detection - Training
1. Controller Training Program Has a controller training program been established to provide training for each
controller to carry out their roles and responsibilities? (CR.CRMTRAIN.CONTROLLERTRAIN.P) 192.631(h)
2. Controller Training Program Has a controller training program been implemented to provide training for each
controller to carry out their roles and responsibilities? (CR.CRMTRAIN.CONTROLLERTRAIN.R) 192.631(h)
3. Training Program Review Have processes been established to review the controller training program content to
identify potential improvements at least once each calendar year, but at intervals not to exceed 15 months?
(CR.CRMTRAIN.TRAININGREVIEW.P) 192.631(h)
4. Training Program Review Have processes been implemented to review the controller training program content to
identify potential improvements at least once each calendar year, but at intervals not to exceed 15 months?
(CR.CRMTRAIN.TRAININGREVIEW.R) 192.631(h)
5. Content of Training Program Does training content address all required material, including training each controller
to carry out the roles and responsibilities that were defined by the operator? (CR.CRMTRAIN.TRAININGCONTENT.R) 192.631(h)
6. List of AOCs for Training Has training been conducted on the abnormal operating conditions (AOCs) that are likely to
occur simultaneously or in sequence identified by the operator? (CR.CRMTRAIN.AOCLIST.R) 192.631(h)(1)
7. Controller Training and Qualification Does the training program provide controller training on recognizing and
responding to abnormal operating conditions that are likely to occur simultaneously or in sequence?
(CR.CRMTRAIN.TRAININGABNORMAL.P) 192.631(h)(1)
GD.2025.01 Page 16 of 85

<<<PAGE 17>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
8. Controller Training and Qualification Do records indicate the training program used a simulator or tabletop
exercises to train controllers how to recognize and respond to abnormal operating conditions? (CR.CRMTRAIN.TRAINING.R)
192.631(h)(2)
9. Controller Training and Qualification Does the training program use a simulator or tabletop exercises to train
controllers how to recognize and respond to abnormal operating conditions? (CR.CRMTRAIN.TRAINING.O) 192.631(h)(2)
10. Communication Training Does the CRM program train controllers on their responsibilities for communication under
the operator's emergency response procedures? (CR.CRMTRAIN.COMMUNICATIONTRAINING.P) 192.631(h)(3)
11. Working Knowledge of Pipeline System Does the training program provide controllers a working knowledge of
the pipeline system, especially during the development of abnormal operating conditions? (CR.CRMTRAIN.SYSKNOWLEDGE.P)
192.631(h)(4)
12. List of Infrequently Used Pipeline Setups Has a list of pipeline operating setups that are periodically (but
infrequently) used been established? (CR.CRMTRAIN.INFREQOPSLIST.R) 192.631(h)(5)
13. Review of Procedures Prior to Use Do processes specify that, for pipeline operating set-ups that are periodically
(but infrequently) used, the controllers must be provided an opportunity to review relevant procedures in advance of their use?
(CR.CRMTRAIN.INFREQOPSREVIEW.P) 192.631(h)(5)
14. Control Room Team Training - Personnel Do processes establish who, regardless of location, operationally
collaborates with control room personnel? (CR.CRMTRAIN.TEAMTRAINPERSONNEL.P) 192.631(h)(6)
15. Control Room Team Training - Frequency Do processes define the frequency of new and recurring team
training? (CR.CRMTRAIN.TEAMTRAINFREQ.P) 192.631(h)(6)
16. Control Room Team Training - Completeness Do processes address all operational modes and operational
collaboration/control? (CR.CRMTRAIN.TEAMTRAINCOMPLETE.P) 192.631(h)(6)
GD.2025.01 Page 17 of 85

<<<PAGE 18>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
17. Control Room Team Training - Operational Experience Do processes include incorporation of lessons
learned from actual historical events and other oil-gas industry events? (CR.CRMTRAIN.TEAMTRAINEXPERIENCE.P) 192.631(h)(6)
18. Control Room Team Training - Exercises Do records indicate that training exercises were adequate and
involved at least one qualified controller? (CR.CRMTRAIN.TEAMTRAINEXERCISE.R) 192.631(h)(6)
19. Control Room Team Training - Exercises Does implementation of a control room team exercise demonstrate
performance in accordance with regulatory and process requirements? (CR.CRMTRAIN.TEAMTRAINEXERCISE.O) 192.631(h)(6)
20. Control Room Team Training - Identified Individuals Do records demonstrate that individuals identified
as of January 23, 2018 received team training by January 23, 2019? (CR.CRMTRAIN.TEAMTRAINIDENTINDIVIDUAL.R)
192.631(h)(6)
CRM, SCADA, and Leak Detection - Compliance Validation and
Deviations
1. Submittal of Procedures Are there adequate processes to assure that the operator is responsive to requests from
applicable agencies to submit their CRM procedures? (CR.CRMCOMP.SUBMITPROCEDURES.P) 192.631(i)
2. Record of Procedure Submittals Has the operator been responsive to requests from applicable agencies to submit
their CRM procedures? (CR.CRMCOMP.SUBMITPROCEDURES.R) 192.631(i)
3. CRM Coordinator Is there an individual that is responsible and accountable for compliance with requests from PHMSA or
other applicable agencies? (CR.CRMCOMP.CRMCOORDINATOR.P) 192.631(i)
4. CRM Records Management Are records management processes adequate to assure records are sufficient to
demonstrate compliance with the CRM rule? (CR.CRMCOMP.RECORDS.P) 192.631(j)(1)
GD.2025.01 Page 18 of 85

<<<PAGE 19>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
5. CRM Records Are records sufficient to demonstrate compliance with the CRM rule? (CR.CRMCOMP.RECORDS.R)
192.631(j)(1)
6. Electronic Records Are electronic records properly stored, safeguarded, and readily retrievable?
(CR.CRMCOMP.ELECTRONICRECORDS.R) 192.631(j)(1)
7. CRM Deviations Are there processes to demonstrate and provide a documented record that every deviation from any
CRM rule requirement was necessary for safe operation? (CR.CRMCOMP.DEVIATIONS.P) 192.631(j)(2)
8. Deviation Records Were all deviations documented in a way that demonstrates they were necessary for safe operation?
(CR.CRMCOMP.DEVIATIONS.R) 192.631(j)(2)
Design and Construction - Construction
1. Joining of Materials Other than by Welding Does the process require that pipeline joints (to be made other
than by welding) be designed and installed in accordance with 192.273? (DC.CO.NONWELDJOINT.P) 192.303 (192.273)
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
2. Underground Clearance Does the process require pipe to be installed with clearances specified in 192.325 and (if
plastic) installed as to prevent heat damage to the pipe? (DC.CO.CLEARANCE.P) 192.303 (192.325(b);192.325(c))
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
3. Underground Clearance Do records indicate that mains are installed with clearances specified in 192.325, and (if
plastic) installed as to prevent heat damage to the pipe? (DC.CO.CLEARANCE.R) 192.325(b) (192.325(c))
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
4. Underground Clearance Do field observations indicate that mains are installed with the clearances specified in
192.325 and (if plastic) installed as to prevent heat damage to the pipe? (DC.CO.CLEARANCE.O) 192.325(b) (192.325(c))
Note: this question is presented in multiple places so you will see multiple instances of it on this report.
GD.2025.01 Page 19 of 85

<<<PAGE 20>>>

PHMSA - Gas Distribution - GD.2025.01 IA Question Set - January 2025
Design and Construction - Design of Pipe - Overpressure Protection
1. Protection against Accidental Overpressuring Does the process require the pipeline have pressure relieving
or pressure limiting devices that are required of 192.195(a), and that they meet the requirements of 192.199 and 192.201?
(DC.DPCOPP.OVERPRESSURE.P) 192.303 (192.143(b);192.195(a);192.199;192.201(a);192.201(b);192.201(c);192.143(a))
2. Protection against Accidental Overpressuring Do records indicate that the pipeline has pressure relieving or
pressure limiting devices that are required by 192.195(a), and that they meet the requirements of 192.199 and 192.201?
(DC.DPCOPP.OVERPRESSURE.R) 192.195(a) (192.199;192.201(a);192.201(b);192.201(c))
Design and Construction - Construction Weld Inspection
1. Inspection and Test of Welds Does the process require visual inspections of
- **truncated:** true
- **body characters:** 178942