{"operation":"document","citation":"PHMSA Annual Report 760182 (1976)","title":"DUCK HILL GAS SYSTEM — Gas distribution annual report (1976)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"1976-12-31","effective_on":null,"summary":"Gas distribution; reporting year 1976; MS. Operator-reported infrastructure data.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-annual-92bd782e9fe4b03ab4d85e39.json","markdown":"https://regulus.evalyn.ai/document/phmsa-annual-92bd782e9fe4b03ab4d85e39.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-annual-92bd782e9fe4b03ab4d85e39","source_url":"https://data.transportation.gov/d/aemm-7pyq","body":"Gas distribution annual report for reporting year 1976, submitted by DUCK HILL GAS SYSTEM (operator 3580). Reported scope: MS. Represented states: MS. Selected reported fields: system miles of main: 27; system services: 374; leaks outside force: 1; leaks construction defect: 7; leaks material failure: 93. The sortable date is the reporting-period end, not the operator submission date.","truncated":false,"body_characters":387}