# GORDON TERMINAL SERVICES — Notice of Amendment

- **operation:** document
- **citation:** CPF 120026004M
- **title:** GORDON TERMINAL SERVICES — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2002-02-19
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120026004m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120026004m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120026004m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120026004M
**body:**

Notice of Amendment involving GORDON TERMINAL SERVICES. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2002-02-19 and is reported as closed as of 2004-06-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120026004M_Final Order_04302003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120026004M/120026004M_Final%20Order_04302003.pdf

120026004m_final order_04302003_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120026004M/120026004m_final%20order_04302003_text.pdf

120026004m_final order_04302003_text.pdf

US, Department
of Ttonsportatton
Research and
Special prattrams
ftdmtntslratlan
400 seventh sl s w
Washington O C 20590
APR 30 Z03
Timothy H Gordon
Vice President, Operations
Gordon Termmal Services Company
1000 Ella Street
McKees Rocks, Pennsylvaiua 15136
Re CPF No 1-2002-6006
CPF No 1-2002-6004-M
Dear Mr Gordon
Enclosed is the Fmal Order issued by the Associate Admuustrator for Pipelme Safety
m the above-referenced cases It makes findings of violation and a findmg of madequate
procedures, and requires certain corrective action and revision of certain operations,
mamtenance and emergency procedures When the terms of the Order are completed, as
determined by the Director, Eastern Region, ttus enforcement action wfil be closed Your
receipt of the Final Order constitutes service of that document under 49 C F R 1't 190 5
Sincerely,
Gwendolyn M Hfi
Pipeline Comphance Registry
Office of Pipehne Safety
Enclosure
CERTIFIED MAIL - RETURN RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter of
Gordon Ternunal Services Company, )
Respondent
)
)
)
)
)
)
CPF No 1-2002-6006
CPF No I-2002-6004-M
FINAL ORDER
On December 20, 2001 and January 8, 2002, pursuant to 49 U S C ) 60117, a representative
of the Office of Pipelme Safety (OPS) conducted an on-site pipelme safety mspection of
Respondent's facihties and records m McKees Rocks, Pennsylvama As a result of the
inspection, the Director, Eastern Region, OPS, issued to Respondent, by letter dated February
15, 2002, a Notice of Probable Violation, Proposed Comphance Order (Notice I), and by letter
dated February 19, 2002, a Notice of Amendment (Notice 2) In accordance with 49 C F R
) 190 207, Notice 1 proposed finding that Respondent had violated 49 C F R $tt 195 505, 199 7
and 199 202 snd proposed that Respondent take certain measures to correct the alleged
violations Notice 2 proposed, m accordance with 49 C F R tJ 190 237, that Respondent amend
tlat
its procedures for Operations, Mamtenance and Emergencies
Respondent responded to the Notices by letter dated May 7, 2002 (Response) Respondent did
not contest the allegations of violation but provided information concermng the corrective
actions it was taking Respondent also requested an extension of time to subrmt its amended
procedures The Region, m a letter dated May 21, 2002, granted Respondent additional time
Respondent did not request a hearing, consequently, Respondent wiuved its right to one
FINDINGS OF VIOLATION
Respondent did not contest the alleged violations for
195 505, 199 7, and 199 202 in Notice
1 Accordingly, I find that Respondent violated the following sections of 49 C F R Parts 195
and 199, as more fully descnbed in Notice 1
49 C F R tJ 195 505 — faihng to have a written operator quahfication program,
49 C F R $ 199 7 — fatlmg to maintain and follow a written anti-drug plan that
conforms to the requirements of Part 199 and the DOT Procedures in Part 40, and



49 C F R $ 199 202 — faihng to maintam and follow a written alcohol nususe plan that
conforms to the requuements of Subpart B, Part 199 and the DOT Procedures m
Part 40
These findings of violation will be considered pnor offenses m any subsequent enforcement
achon taken agamst Respondent
COMPLIANCE RDER
Under 49 U S C ) 60118(a), each person who engages m the uansportatton ofhazardous hquids
or who owns or operates a pipehne facihty is reqmred to comply with the apphcable safety
standards estabhshed under chapter 601 Pursuant to the authority of 49 U S C $ 60118(b) and
49 C F R $ 190 217, Respondent is ordered to take the followmg actions to ensure compliance
with the pipelme safety regulations applicable to its operations
(1) Develop a wntten Operator Qualification (OQ) plan that sattsfies the requirements set
forth in 49 C F R Part 195, Subpart G
(2) Develop and follow a written Drug and Alcohol plan that meets the requuements of
49 C FR Parts 40 and 199
(3) Submit a copy of the completed OQ plan and the completed Drug and Alcohol plan to
the Eastern Region Director witlun 90 days of receipt of this Fmal Order. The address
is Office of Pipelme Safety, 400 Seventh Street, SW, Room 7130, Washmgton, DC
20590
AMENDMENT OF PROCEDURES
Notice 2 alleged inadequacies m Respondent's Operations, Mamtensnce and Emergencies
Manual and proposed to reqmre amendment of Respondent's procedures to comply with the
requirements of 49 C F R ltd 195 402, 403, 404, 406, 408, 410, 414, 416, 420, 422, 426, 428,
430, 434, 438, 440, and 442 Respondent did not contest the proposed Notice of Amendment
Accordingly, I find that Respondent's procedures are inadequate to ensure safe operation of its
pipelme system Pursuant to 49 U S C $ 60108(a) and 49 C F R tt 190 237, Respondent is
ordered to make the following revisions to its procedures Respondent inust-
1 t'I 195 402 (c)(5) - Develop procedures for analyzing pipelme accidents to determine
then causes
2 tt 195 402 (c)(7) - Amend its procedures for start-up and shut-down of the system to
include mstructions apphcable to Airport Services International (ASI) personnel
Procedures should mclude instructions for proper commuiucation between ASI and
Gordon Termmal Services personnel before, during, and after transfer/delivery
operations, and steps for valve sequencing and tank gaugmg



$ 195 402 (c)(8) - Develop procedures for facilities not equipped to fiul safe to address
the momtonng of pipehne pressure dunng startup and shutdown to assure operauon
withm the maximum operating pressure for the system
$ 195 402 (c)(9) - Develop procedures for detecting abnormal operating conditions for
facihties not equipped to fiul safe in areas that would reqmre tnunedhate response by
operating personnel These conditions can be identified by monttormg pressure,
temperature, flow or other appropnate operational data and transmittmg tlus data to an
attended location
II 195 402 (c)(11) - Develop procedures for muumizmg the hkelihood of accidental
igmtton of vapors in areas where the potential exists for the presence of flammable
hqmds or gases
II 195 402 (c)(12) - Develop procedures for estabhslung and mamtainmg liaison with
fire, police, and other appropnate pubhc officials to learn the responsibility and
resources of each government orgamzahon that may respond to a hazardous hquid
pipelme emergency These procedures must also address the means of commumcatton,
the mtervals at wluch the luuson meetmgs will be conducted, and a description of the
mformation to be exchanged
CI 195 402 (c)(13) - Develop procedures to provide for reviewing the work done by
operatmg personnel to determme the effectiveness of the procedures used m normal
operation and maintenance
$ 195 402 (c)(14) - Develop procedures to protect personnel from hazards of unsafe
accumulations of vapor or gas m excavated trenches and makmg available emergency
rescue equipment, mcludmg a breathing apparatus and a rescue harness and, when
needed at the excavation site
$ 195 402 (d)(1-5) — Develop abnormal operatmg procedures to provide safety when
operating design lumts have been exceeded These procedures must address the
reqmrements of IN 195 402 (d)(1-5)
) 195 402 (e)(1) - Amend its emergency procedures to identify the notices of events that
reqmre immediate response by the operator, fire, pohce, or other responder
II 195 402 (e)(3) - Amend its emergency procedures to be more specific about the types
of emergency equipment needed at the scene of an emergency and where the eqmpment
hke backhoes, excavators, iur compressors, can be located
f 195 402 (e)(6) — Develop emergency procedures to provide mstructions for mminuzing
public exposure to tn)ury and reducing the probability of accidental ignition by assisting
with the evacuation of residents aud assisting with halting or rerouting the traffic on
roads and railroads in the affected area, or takmg other appropriate action



13 Ii 195 402 (e)(9) - Develop emergency procedures to provide mstruchons for conducting
a post accident review of employees' activihes to determine if procedures were effective
m each emergency, and for taking corrective schon where deficiencies are found
14 Ik 195 402(f) - Develop procedures to mstruct personnel performmg operahon and
maintenance activities to recognize conditions that potentially maybe safety-related and
sub)ect to the reporhng reqmrements under CI 195 55
15 195403 - Develop emergency response trainmg procedures to address the
requirements of Ii 195 403
16 I9 195 404 - Develop procedures to address the requirements for mamtammg maps and
records
17 Ii 195 406 - Develop procedures to address the requuements for maximum operahng
pressure
18 Ik 195 408 - Amend its commumcahons procedures to include a means for momtortng
operahonal data as required by It 195 402 (c)(9)
19 $ 195 410 — Amend its procedures to specify where lme markers have to be located
20 «i 195 414 - Amend its procedures for cathodic protection to address the requirements
of $ 195 414
21 $ 195 416 — Amend its external corrosion control procedures to address the requirements
of $ 195 416
22 |i 195 420 -Develop procedures to address the reqmrements for valve mamtenance
23 II195 422 - Amend its procedures for pipelme repair to cover rnatenal, welding, and
testing that is planned for pipelme and tank facihties repairs m the system
24 ) 195 426 - Develop procedures to address the requirements for scraper and sphere
facihhes to instruct personnel operahng these facdities
25 Ii 195 428 - Develop procedures for inspectmg and testing pressure limiting devices,
rehef valves, pressure regulators, or other items of pressure control equipment
26 ) 195 430 - Amend its procedures on firefighting equipment to satisfy the requirements
of 195 430 and to specify the type of firefightmg equipment, location, methods of
inspection, and mspection frequencies



27 $ 195 434 - Develop procedures to provide guidance to personnel regardmg the
placement of signs In addition, the procedures must specify the mformatton that is
reqmred to be visible on the signs
28 Subnut the amended procedures to the Regional Director, Eastern Region, OPS witlun
30 days followmg receipt of this Order
29 The Regional Director may extend the penod for complying with the required items if
the Respondent requests an extension snd adequately Justifies the reasons for the
extension
The terms and conditions of this Order are effective upon receipt
Failure to comply with this Fmal Order may result m the assessment of civil penalties of up to
$100, 000 per violation per day, or in the referral of the case for judicial enforcement.
Under 49 C F R tt 190 215, Respondent has a nght to petition for reconsideration of tlus Fmal
Order The petition must be received witlun 20 days of Respondent's receipt of tlus Final Order
and must contain a bnef statement of the issue(s) The fihng of the petition automatically stays
the payment of any civil penalty assessed All other terms of the order, includmg any requu ed
corrective action, remain m full effect unless the Associate Admimstrator, upon request, grants
a stay The terms and conditions of this Fmal Order are effective on receipt
APR 30 2003
Date Issued
tacey Gerard
4 Associate Adnurustrator
for Pipelme Safety
- **truncated:** false
- **body characters:** 11927