# TOTAL PEAKING SERVICES — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 120063002
- **title:** TOTAL PEAKING SERVICES — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2006-05-23
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 193.2605(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120063002.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120063002.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120063002
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120063002
**body:**

Notice of Probable Violation involving TOTAL PEAKING SERVICES. PHMSA's enforcement data identifies the cited regulation as 193.2605(b). The case was opened on 2006-05-23 and is reported as closed as of 2008-01-30. Proposed civil penalty: $46,300. Assessed civil penalty: $46,300. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120063002_FinalOrder_01182008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120063002/120063002_FinalOrder_01182008.pdf

120063002_finalorder_01182008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120063002/120063002_finalorder_01182008_text.pdf

120063002_finalorder_01182008_text.pdf

O
U S Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
i 200 New Jersey Ave S E
Washrngton DC 20590
JAN t 8 z03
Timothy Kelley
Vice President Energy Services
Total Peaking Services, LLC
Southern Connecticut Gas Company
77 Hartland Street
East Hartford, CT 06108
Re: CPF No. 1-2006-3002
Dear Mr. Kelley:
Enclosed is the Final Order issued in the above-referenced case It makes findings of
violation and assesses a civil penalty of $46, 300. The penalty payment terms are set forth
in the Final Order. This enforcement action closes automatically upon payment. Your
receipt of the Final Order constitutes service of that document under 49 C. F. R. $ 190. 5,
Thank you for your cooperation in this matter.
Sincerely,
Je rey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc (by email): Mr. Byron Coy, Director, Eastern Region, PHMSA
Ms. Denise Desautels, Esq. ,
Office of Chief Counsel, PHMSA
Ms. Anne O. McCrory, Esq. ,
Senior Attorney, The Southern Connecticut Gas Co and
Total Peaking Services, LLC.
Mr. Philip Sher, DPUC
CERTIFIED MML — RETURN RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D. C. 20590
In the Matter of
)
)
)
Total Peaking Services, LLC, and )
Southern Connecticut Gas Co.
, )
Respondent
)
)
)
CPF No. 1-2006-3002
FINAL ORDER
On October 3-5, 2005, pursuant to 49 U. S. C. $ 60117, representatives of the State of
Connecticut Department of Public Utility Control ("DPUC"), as interstate agent of the
Pipeline and Hazardous Materials Safety Administration ("PHMSA"), conducted an on-
site safety inspection of Respondent's liquefied natural gas facility and records in
Milford, Connecticut ("LNG Facility" ). Respondent is comprised of the two companies
indicated above. The indicated companies jointly own and operate the LNG Facility. As
a result of the inspection, the Director, Eastern Region, PHMSA, issued to Respondent,
by letter dated May 23, 2006, a Notice of Probable Violation and Proposed Civil Penalty
(" Notice" ). In accordance with 49 C. F. R, $ 190. 207, the Notice proposed finding that
Respondent had violated 49 C. F. R. ) 193. 2605(b) and assessing a civil penalty of
$46, 300 for the alleged violation.
Respondent replied to the Notice by letter dated June 22, 2006 (" Response" ). In its
Response, Respondent offered information in explanation of the allegation of violation
and sought elimination of the proposed civil penalty. In addition, by email dated June 26,
2006, Respondent requested a hearing, which was subsequently held via telephone
conference on September 6, 2006, with Mr. Jim Curry, Esquire, Office of Chief Counsel,
PHMSA, presiding. At the hearing, Respondent, who was represented by counsel,
conceded that it had violated 49 C. F. R, ) 193. 2605(b) but continued to seek elimination
of the proposed penalty. At the conclusion of the hearing, Respondent was afforded the
opportunity to submit a post-hearing brief within three (3) weeks. Respondent's counsel
timely submitted a post-hearing brief (" Closing" ) on September 26, 2006.



FINDINGS OF VIOLATION
Item 1: The Notice alleged that Respondent violated 49 C. F. R. Part 193. 2605(b), which
states:
49 C. F. R. g 193. 2605 Maintenance procedures.
(a) Each operator shall determine and perform, consistent with
generally accepted engineering practices, the periodic inspections or
tests needed to meet the applicable requirements of this subpart and
to verify that components meet the maintenance standards prescribed
by this subpart.
(b) Each operator shall follow one or more manuals of written
procedures for the maintenance of each component, including any
required corrosion control. The procedures must include:
(1) the details of the inspections or tests determined under paragraph
(a) of this section and their frequency of performance;. . . . .
Notice Item 1 alleged that Respondent violated 49 C. F. R. $ 193. 2605(b) by failing to
meet required deadlines provided in its manual of written procedures for inspection of
certain fire protection components at the LNG Facility. At the inspection, Respondent
offered a certain document, entitled "TPS Inspection and Maintenance Plan, IMP-7. 3
Hazard Detection and Mitigation" ("IMP-7. 3"), dated November 14, 2002, as its manual
of written procedures. That document covered fire protection systems, including
Respondent's gas detectors and water systems, and required that fire protection systems
be inspected at least semi-annually. Respondent also submitted inspection forms that
indicated what types of activities Respondent was required to perform during semi-
annual inspections.
During DUPC's inspection of Respondent's records, inspectors discovered that
Respondent had failed to meet its own semi-annual inspection requirement for four (4)
gas detectors at the facility. Gas detectors test for the presence of flammable gas and are
intended to alert Respondent to potentially dangerous leaks that could lead to fires or
explosions. DUPC inspectors discovered that Respondent had last inspected the gas
detector at the AC Control House on March 29, 2004, thereby missing the required
July/August 2004, February 2005, and August 2005 inspection periods. DUPC
inspectors also discovered that Respondent had not performed the required August 2005
inspection of the gas detectors for the CP-30, CP-10 South, and CP-84A units.
In its Response, Respondent argued that its written policy did "not indicate with any
specificity what exactly is required to 'inspect' the fire protection system, "' Respondent
' Response at 1



further argued that it subjected all four (4) of the gas detectors to "manual monthly
readings" to ascertain that the gas-to-air ratios were below 20% of the lower explosive
level ("LEL"). The LEL is the minimum concentration of gas in a given environment at
which a fire or explosion could occur. Respondent argued that the monthly manual
readings were "supportive of inspection activities for these units and consistent with the
[Respondent's] written procedures. "
Although Respondent's monthly readings may have been "supportive" of inspection
activities, the fact remains that the required semi-annual tests were simply not performed
during the monthly manual readings. Respondent's inspection forms for semi-annual gas
detector inspections contain specific provisions for performing and recording the results
of gas detector readings, zero checks, span checks, as well as inspection notes taken.
Respondent's procedures also specifically require that personnel who are inspecting
system components shall review the maintenance measures required from the previous
inspection and make recommendations regarding required and recommended
4
maintenance at the time of the gas detector inspections, Respondent's practice of
monthly manual readings does not satisfy the semi-annual inspection requirement set
forth in Respondent's written procedures.
The requirement for LNG operators to follow their own inspection plans is an essential
part of maintaining the safety of LNG and pipeline facilities. Section 193. 2605(b)
requirements for operators to have and follow written procedures derive, in part, from 49
U. S. C. $ 60108(a)(1), which provides that "each person owning or operating an intrastate
gas pipeline facility or hazardous liquid pipeline facility shall carry out a current written
plan (including any changes) for mspection and maintenance of each facility. . .
" Early in
the development of Federal pipeline safety law, Congress required operators to create,
file with the Secretary, and comply with their inspection and maintenance plans. ' The
House Report on the Natural Gas Pipeline Safety Act of 1968 found that "an important
part of the program proposed by this legislation to achieve pipeline safety is the plan of
inspection and maintenance according to which the company maintains surveillance of its
lines and facilities. "
During the hearing and in its Closing, Respondent conceded that it had missed the
required semi-annual inspection intervals for the four (4) gas detectors above. '
After considering all of the evidence, I find Respondent violated ) 193. 2605(b) by failing
to perform the semi-annual inspections for the AC Control House gas detector in
July/August 2004, February 2005, and August 2005 and for the gas detectors for the CP-
30, CP-10 South and CP-84A units in August 2005, in accordance with Respondent's
written procedures set forth in IMP-7. 3.
' Id. at 1-2.
'Id at2,
' IMP-7. 3, Procedure Guidelmes 17-25.
See The Natural Gas Pipeline Safety Act of 1968, P L 90-481
HR. Rep No 1390 (1968), repnnted m U S Code Congressional and Administrative News, at 3239-40
(1968) ' Closing at 2



This finding of violation will be considered a prior offense in any subsequent
enforcement action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U. S. C. ) 60122, Respondent is subject to an administrative civil penalty not to
exceed $100, 000 per violation for each day of the violation up to a maximum of
$1, 000, 000 for any related series of violations. In addition, under 49 C. F. R. $190. 223(c)
any person violating a standard or order under 49 U. S. C. $ 60103 (" Standards for
liquefied natiual gas pipeline facilities" ) is subject to an additional administrative civil
penalty not to exceed $50, 000 for each violation.
49 U. S. C. ) 60122 and 49 C. F. R. ) 190. 225 require that in determining the amount of the
civil penalty, I consider the following criteria: nature, circumstances, and gravity of the
violation; degree of Respondent's culpability; history of Respondent's prior offenses;
Respondent's ability to pay the penalty; good faith by Respondent in attempting to
achieve compliance; the effect on Respondent's ability to continue in business; and such
other matters as justice may require.
The Notice proposed a civil penalty of $43, 600 for violation of ) 193. 2605(b), The
failure of Respondent to follow its written procedures for the inspection and maintenance
of gas detection equipment jeopardizes public safety, property, and the environment. The
failure to timely inspect and test gas detectors increases the risk that a gas leak may not
be detected and a fire or explosion may result. In its Response, at the hearing and in the
Closing, Respondent offered arguments in support of its request for elimination of
PHMSA's proposed civil penalty.
First, in its Response, Respondent stated that once it had become aware of PHMSA's
concerns regarding the semi-annual inspections, Respondent reminded its personnel of
the importance of completing semi-annual inspections and all inspection reports.
Respondent also stated that it instituted an additional procedure requiring supervisors to
sign-off on each semi-annual inspection report to confirm completion of the inspection
and associated reports. Though PHMSA appreciates Respondent's efforts to prevent
future non-compliance, I find that Respondent's efforts after the violation occurred do not
warrant elimination or mitigation of the civil penalty. Respondent is obligated to comply
with the regulations at all times and will not be given credit for subsequent efforts to
improve performance.
Second, Respondent asked PHMSA to consider its practice of manual monthly readings
of the gas detectors in determination of the gravity of the violation, As stated in the
Findings of Violation, Respondent's manual monthly readings do not satisfy the semi-
annual inspection requirement. The semi-annual testing and inspection in Respondent's
' Response at 2.
Id.



written procedures appears to be intended to allow Respondent to determine if its
detectors are functioning correctly. Manual monthly readings alone do not achieve this
important safety goal. The regulations require that Respondent follow its written
procedures. I find that Respondent's practice of manual monthly readings does not
warrant mitigation of the civil penalty amount in this case.
Third, Respondent argues that its CP-30 liquefaction turbine and CP-10 Unit were not in
service and that the gas sources to each were cut off at the time the respective gas
detector inspections should have occurred. ' Respondent argued that the safety of the
facility and employees was therefore not jeopardized by Respondent's "failure to
complete th[e] inspection" of the CP-30 gas detector. " Respondent noted that it now
inspects the CP-30 detector according to company policy. '
Respondent also argued that its CP-10 gas detector was redundant to another detector in
the same building and that the Unit serviced by the CP-10 detector was taken out of
service more than ten (10) years ago.
' Respondent explained that it "does not typically
extend all of [its] equipment inspection practices to equipment that is integrally related to
equipment which is no longer in service. "' However, Respondent's records indicated
that, except for the August 2005 period at issue, it had historically inspected the CP-10
detector on the semi-annual schedule provided by IMP-7. 3. "
Respondent also argued that its failure to inspect the AC Control House detector was a
good faith mistake and was mitigated by the presence of two other detectors at the AC
Control House building. Respondent argued that no significant safety issues were raised
by its failure in inspect this detector. Respondent did not discuss its failure to inspect the
CP-84A gas detector unit.
Respondent underestimates the importance of adherence to its inspection procedures.
Written procedures are intended, in part, to prevent mistakes that could lead to accidents
Respondent's failure to inspect the four (4) gas detectors in accordance with its written
procedures is not mitigated by the presence of other gas detectors nearby nor by gas
sotnces allegedly cut off to the equipment served by the detectors. Accordingly, I find
that mitigation of the proposed civil penalty is not warranted,
It is noteworthy that this is not the first time Respondent has failed to test certain
components at its LNCJ Facility. In 2005, PHMSA issued a Final Order to Total Peaking
"Closing at 2-3. Respondent provides no evidence that the gas sources to CP-30 and CP-10 were in fact
cut off. However, it is not necessary to estabhsh this fact to decide this matter, as it is not relevant to
Respondent's failure to follow its procedures
" Closing at 3
"IJ
14 Iy " The Milford LNG plant semi-annual inspection records submitted by Respondent mdicate that the CP-10
gas detector was inspected and tested in March 2004, July/August 2004 and February 2005



Services, finding that it had failed to test certain equipment at its Milford LNG facility. '
The 2005 violation concerned a failure to test equipment according to certain deadlines.
The 2005 violation for failure to inspect and test equipment is similar to the finding of
violation in the present case.
For the foregoing reasons, having reviewed the record and considered the assessment
criteria, I assess Respondent a total civil penalty of $46, 300. There is nothing in the
record indicating that payment of this penalty would adversely affect Respondent's
ability to continue in business.
Payment of the $46, 300 civil penalty must be made within 20 days of service of this Final
Order. Federal regulations (49 C, F. R. ( 89. 21(b)(3)) require this payment be made by
wire transfer, through the Federal Reserve Communications System (Fedwire), to the
account of the U. S. Treasury. Detailed instructions are contained in the enclosure.
Questions concerning wire transfers should be directed to: Financial Operations Division
(AMZ-341), Federal Aviation Administration, Mike Monroney Aeronautical Center, P. O
Box 25082, Oklahoma City, OK 73125; (405) 954-8893.
Failure to pay the $46, 300 civil penalty will result in accrual of interest at the current
annual rate in accordance with 31 U. S. C. $ 3717, 31 C. F. R. $ 901. 9 and 49 C. F. R. $
89. 23. Pursuant to those same authorities, a late penalty charge of six percent (6%) per
annum will be charged if payment is not made within 110 days of service. Furthermore,
failure to pay the civil penalty may result in referral of the matter to the Attorney General
for appropriate action in a United States District Court.
Under 49 C. F. R. $ 190. 215, Respondent has a right to submit a Petition for
Reconsideration of this Final Order. The petition must be received within 20 days of
Respondent's receipt of this Final Order and must contain a brief statement of the
issue(s). The filing of the petition automatically stays the payment of any civil penalty
assessed. However if Respondent submits payment for the civil penalty, the Final Order
becomes the final administrative decision and the right to petition for reconsideration is
waived. The terms and conditions of this Final Order are effective on receipt.
tjAN 1 8 20{}8
Date Issued
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
' See In the matter of Total Peaking Services, Final Order, CPF No 1-2005-3003 (Aug 18, 2005) (findmg
that Respondent violated 49 C F R $ 193 2619 for failing to test the low-temperature shutoff controllers at
certam vaporizer outlets before seasonal use)