# TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 120071005M
- **title:** TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2007-07-03
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120071005m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120071005m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120071005m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120071005M
**body:**

Notice of Amendment involving TRANSCONTINENTAL GAS PIPE LINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.605(a). The case was opened on 2007-07-03 and is reported as closed as of 2007-12-31. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120071005M_Notice of Amendment_070307.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120071005M/120071005M_Notice%20of%20Amendment_070307.pdf

120071005m_notice of amendment_070307_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120071005M/120071005m_notice%20of%20amendment_070307_text.pdf

120071005M_operator response_11012007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120071005M/120071005M_operator%20response_11012007.pdf

120071005m_notice of amendment_070307_text.pdf

u S Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
409 3rd Street, SW Suite 300
Washington, OC 20024
NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT RE UESTED
July 3, 2007
Mr Randall Barnard
Vice President of Operations
Wilhams Gas Pipeline-Transco
2800 South Post Oak Road
Houston, TX 77251
CPF I-2007-1005M
Dear Mr Bernard
On December 13 and 14, 2006, a representative of the Pipehne and Hazardous Matenals Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 Umted States Code investigated the
incident that took place on December 12, 2006 at Wilhams Gas Pipelme — Transco (Williams)
Compressor Station Buildmg at the Elhcott City, MD Station 190
On the basis of the investigation, PHMSA has identified apparent inadequacies found witlun
Wilhams' plans or procedures, as descnbed below



1. I1192. 605 Procedural manual for operations, maintenance, and emergencies.
(a) GeneraL Each operator shall prepare and follow for each pipeline, a manual
of written procedures for conducting operations and maintenance activities and
for emergency response. For transnussion lmes, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months, but at least
once each calendar year. This manual must be prepared before operations of a
pipelme system commence. Appropriate parts of the manual must be kept at
locations where operations and mamtenance activities are conducted.
Wilhams responded to PHMSA's request for specific information (letter dated April 5, 2007) by
letter dated May 17, 2007 which discussed Wilhams' post incident root cause analysis Based on
the investigation of the incident and information provided by Wilhams, changes need to be
incorporated in Williams' operating and maintenance procedures that address the following
I Activities involving the use of welding and torch cutting should be avoided inside the
compressor building
2 The need for the lead person responsible for specific mamtenance activities to msure that
necessary detailed steps to isolate the main compressor umts are communicated to
maintenance personnel including welders
3 Training of employees and any other personnel responsible for completing the hot work
permit for compressor station miuntenance activihes
Res onse to this Notice
This Notice is provided pursuant to 49 U S C $ 60108(a) and 49 C F R g 190 237 Enclosed as
part of this Notice is a document entitled Response Options for Prpelme Operators m
Compliance ProceeCkngs Please refer to this document and note the response options Be
advised that all matenal you submit in response to this enforcement action is sub]ect to being
made pubhcly avadable If you beheve that any portion of your responsive material qualifies for
confidential treatment under 5 U S C 552(b), along with the complete ortgmal document you
must provide a second copy of the document with the portions you beheve qualify for
confidenttal treatment redacted and an explanatiou of why you beheve the redacted information
quahfies for confidentia treatment under 5 U S C 552(b) If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authonzes the Associate Admuustrator for Pipehne Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order



If, atter opportunity for a heanng, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C F R $ 190 237) If you are not contesting this Notice, we propose that you submit your
amended procedures to my office withm 120 days of receipt of this Notice This penod may be
extended by wntten request for good cause Once the madequacies identified herein have been
addressed in your amended procedures, this enforcement action wdl be closed
In correspondence concerning this matter, please refer to CPF I-2007-1005M and, for each
document you submit, please provide a copy in electromc format whenever possible
Sincerely,
Byro Coy, PE
Director, Eastern Region
Pipehne and Hazardous Matenals Safety Adnuiustration
Enclosure Response Options for Pipehne Operators tn Comphanee Proceedings
- **truncated:** false
- **body characters:** 5187
