# HOPKINTON LNG CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 120083001M
- **title:** HOPKINTON LNG CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2008-09-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2637.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120083001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120083001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120083001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120083001M
**body:**

Notice of Amendment involving HOPKINTON LNG CO. PHMSA's enforcement data identifies the cited regulation as 193.2637. The case was opened on 2008-09-25 and is reported as closed as of 2008-11-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120083001M_Notice of Amendment_09252008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120083001M/120083001M_Notice%20of%20Amendment_09252008.pdf

120083001m_notice of amendment_09252008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120083001M/120083001m_notice%20of%20amendment_09252008_text.pdf

120083001M_operator response_11052008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120083001M/120083001M_operator%20response_11052008.pdf

120083001m_notice of amendment_09252008_text.pdf

U S. Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
409 3rd Street, SW, SUite 300
Washington, DC 20024
NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT RE UESTED
September 25, 2008
Mr. Phil Andreas
Vice President, Operations
NSTAR/Hopkinton LNG Corporation
1 NSTAR Way
Westwood, MA 02090-9230
CPF 1-2008-3001M
Dear Mr. Andreas:
From March 25 to March 28, 2008, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Hopkinton LNG Corporation's (Hopkinton LNG) procedures for remediating external corrosion
in Hopkinton, Massachusetts.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Hopkinton LNG's plans or procedures, as described below:
1. f193. 2637 Remedial measures.
Prompt corrective or remedial action must be taken whenever an operator learns by
inspection or otherwise that atmospheric, external, or internal corrosion is not
controlled as required by this subpart.
Operator procedures for remediating external corrosion do not specify a time interval for
corrective action on galvanic anode system deficiencies.



Res onse to this Notice
This Notice is provided pursuant to 49 U. S. C, $ 60108(a) and 49 C. F. R. $ 190. 237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U. S. C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U. S. C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, aAer opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C. F. R. $ 190. 237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 30 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
In correspondence concerning this matter, please refer to CPF 1-2008-3001M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
~ Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings