{"operation":"document","citation":"CPF 120085007M","title":"IMTT-PIPELINE — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2008-10-03","effective_on":null,"summary":"CLOSED notice of amendment citing 191.15, 195.310(b)(10).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120085007m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120085007m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120085007m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120085007M","body":"Notice of Amendment involving IMTT-PIPELINE. PHMSA's enforcement data identifies the cited regulations as 191.15,  195.310(b)(10). The case was opened on 2008-10-03 and is reported as closed as of 2009-09-08. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120085007M_Notice of Amendment_10032008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120085007M/120085007M_Notice%20of%20Amendment_10032008.pdf\n\n120085007M_Notice of Amendment_10032008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120085007M/120085007M_Notice%20of%20Amendment_10032008_text.pdf\n\n120085007M_Notice of Amendment_10032008_text.pdf\n\nNOTICE OF AMENDMENT\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nOctober 3, 2008\nIMTT\nMr. Richard R. Fisette, Vice President\nIMTT-Pipeline\n250 E. 22nd St. P.O. Box 67\nBayonne, NJ 07002\nCPF 1-2008-5007M\nDear Fisette:\nOn May 5-8, 2008, a representative of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected\nyour transmission pipeline in Bayonne, New Jersey.\nOn the basis of the inspection, PHMSA has identified the apparent inadequacies within\nIMTT's plans or procedures, as described below:\n\n\n\n1. §191.15 Transmission and gathering systems: Incident Report\n§191.15(b) Where additional related information is obtained after a report\nis submitted under paragraph (a) of this section, the operator shall make a\nsupplemental report as soon as practicable with a clear reference by date\nand subject to the original report\nIMTT - Pipeline procedures do not address filing a supplemental report, if needed,\nin conjunction with filing original NRC reports.\n2. §195.310 Records\n§195.310(b)(10) Temperature of the test medium or pipe during the test period\nRecording of temperature during a pipeline pressure test is not in IMTT -\nPipeline procedures. Temperatures are recorded on actual IMTT- Pipeline test reports.\nResponse to this Notice\nThis Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed\nas part of this Notice is a document entitled Response Options for Pipeline Operators in\nCompliance Proceedings. Please refer to this document and note the response options. Be\nadvised that all material you submit in response to this enforcement action is subject to being\nmade publicly available. If you believe that any portion of your responsive material qualifies\nfor confidential treatment under 5 U.S.C. 552(b), along with the complete original document\nyou must provide a second copy of the document with the portions you believe qualify for\nconfidential treatment redacted and an explanation of why you believe the redacted\ninformation qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond\nwithin 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the\nallegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to\nfind facts as alleged in this Notice without further notice to you and to issue a Final Order.\nIf, after opportunity for a hearing, your plans or procedures are found inadequate as alleged\nin this Notice, you may be ordered to amend your plans or procedures to correct the\ninadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that\nyou submit your amended procedures to my office within 30 days of receipt of this Notice.\nThis period may be extended by written request for good cause. Once the inadequacies\nidentified herein have been addressed in your amended procedures, this enforcement action\nwill be closed.\nIn correspondence concerning this matter, please refer to CPF 1-2008-5007M and, for\neach document you submit, please provide a copy in electronic format whenever\npossible.\n2\n\n\n\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\nEnclosure: Response Options for Pipeline Operators in Compliance Proceedings\n3","truncated":false,"body_characters":4007}