{"operation":"document","citation":"CPF 120095001M","title":"BUCKEYE PARTNERS, LP — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2009-05-06","effective_on":null,"summary":"CLOSED notice of amendment citing 195.307, 195.402(c)(3), 195.402(d), 195.405(a), 195.410(a)(1), 195.412(a), 195.422(b), 195.452(b)(2), 195.452(b)(6), 195.452(c)(1), 195.452(f)(3), 195.452(f)(4), 195.452(f)(6), 195.452(f)(8), 195.452(g), 195.452(h)(2), 195.452(i), 195.452(j), 195.452(k), 195.452(l)(2), 195.505, 195.505(b), 195.505(i), 195.52(a), 195.561(a), 195.567(a)(1), 195.573(d), 195.575(b), 195.575(d), 195.579(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120095001m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120095001m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120095001m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120095001M","body":"Notice of Amendment involving BUCKEYE PARTNERS, LP. PHMSA's enforcement data identifies the cited regulations as 195.307,  195.402(c)(3),  195.402(d),  195.405(a),  195.410(a)(1),  195.412(a),  195.422(b),  195.452(b)(2),  195.452(b)(6),  195.452(c)(1),  195.452(f)(3),  195.452(f)(4),  195.452(f)(6),  195.452(f)(8),  195.452(g),  195.452(h)(2),  195.452(i),  195.452(j),  195.452(k),  195.452(l)(2),  195.505,  195.505(b),  195.505(i),  195.52(a),  195.561(a),  195.567(a)(1),  195.573(d),  195.575(b),  195.575(d),  195.579(a). The case was opened on 2009-05-06 and is reported as closed as of 2010-11-10. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120095001M_Closure Letter_11102010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120095001M/120095001M_Closure%20Letter_11102010.pdf\n\n120095001M_Closure Letter_11102010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120095001M/120095001M_Closure%20Letter_11102010_text.pdf\n\n120095001M_NOA_05062009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120095001M/120095001M_NOA_05062009.pdf\n\n120095001M_NOA_05062009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120095001M/120095001M_NOA_05062009_text.pdf\n\n120095001M_Operator_Response_08122009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120095001M/120095001M_Operator_Response_08122009.pdf\n\n120095001M_Closure Letter_11102010_text.pdf\n\nU.S. Department 820 Bear Tavern Road, Suite 103\nOf Transportation West Trenton, NJ 08628\nPipeline and 609.989.2171\nHazardous Materials\nSafety Administration\nEXPRESS OVERNIGHT DELIVERY\nNovember 10, 2010\nMr. Jerry J. Ashcroft III\nVice President, Field Operations\nBuckeye Partners, L.P.\nFive TEK Park\n9999 Hamilton Boulevard\nBreinigsville, PA 18031\nCPF 1-2009-5001M\nDear Mr. Ashcroft:\nDuring May and June of 2008, representatives from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) and the State of New York Department of Public Safety, pursuant to\nChapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of\nBuckeye Partners, L.P.’s procedures in Breinigsville, PA. As a result of the inspection, Buckeye\nPartners, L.P. was issued a Notice of Amendment on May 6, 2009, which proposed amendment\nof your procedures.\nBuckeye Partners, L.P. completed its submittal of the amended procedures on August 30, 2010.\nMy staff reviewed the amended procedures, and it appears that the inadequacies outlined in this\nNotice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron E. Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\ncc: New York Public Service Commission","truncated":false,"body_characters":2820}