{"operation":"document","citation":"CPF 120105010M","title":"MOBIL  PIPE  LINE COMPANY — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2010-10-18","effective_on":null,"summary":"CLOSED notice of amendment citing 195.583(b).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120105010m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120105010m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120105010m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120105010M","body":"Notice of Amendment involving MOBIL  PIPE  LINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 195.583(b). The case was opened on 2010-10-18 and is reported as closed as of 2010-12-02. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120105010M_Closure Letter_12022010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120105010M/120105010M_Closure%20Letter_12022010.pdf\n\n120105010M_Closure Letter_12022010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120105010M/120105010M_Closure%20Letter_12022010_text.pdf\n\n120105010M_NOA_10182010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120105010M/120105010M_NOA_10182010.pdf\n\n120105010M_NOA_10182010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120105010M/120105010M_NOA_10182010_text.pdf\n\n120105010M_Operator Response to NOA_11152010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120105010M/120105010M_Operator%20Response%20to%20NOA_11152010.pdf\n\n120105010M_Closure Letter_12022010_text.pdf\n\nU.S. Department 820 Bear Tavern Road, Suite 103\nOf Transportation West Trenton, NJ 08628\nPipeline and 609.989.2171\nHazardous Materials\nSafety Administration\nOvernight Express Mail\nDecember 2, 2010\nMr. Jimmie James\nVice President and Northern Operations Manager\nExxonMobil Pipeline Company\n3225 Gallows Road\nFairfax, VA 22037\nCPF 1-2010-5010M\nDear Mr. James:\nOn July 13, 2010, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-\nsite pipeline safety inspection of ExxonMobil Pipeline Company in South Portland, Maine. As a\nresult of the inspection, ExxonMobil was issued a Notice of Amendment on October 18, 2010,\nwhich proposed amendment of your procedures.\nExxonMobil submitted its amended procedures on November 15, 2010. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron E. Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\nOPID:12628","truncated":false,"body_characters":2285}