# TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP) — Notice of Amendment

- **operation:** document
- **citation:** CPF 120111004M
- **title:** TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP) — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-04-21
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.907(b), 192.935(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120111004m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120111004m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120111004m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120111004M
**body:**

Notice of Amendment involving TEXAS EASTERN TRANSMISSION, LP (SPECTRA ENERGY PARTNERS, LP). PHMSA's enforcement data identifies the cited regulations as 192.907(b),  192.935(a). The case was opened on 2011-04-21 and is reported as closed as of 2011-10-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120111004M_Closure Letter_10142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120111004M/120111004M_Closure%20Letter_10142011.pdf

120111004M_Closure Letter_10142011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120111004M/120111004M_Closure%20Letter_10142011_text.pdf

120111004M_NOA_04212011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120111004M/120111004M_NOA_04212011.pdf

120111004M_NOA_04212011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120111004M/120111004M_NOA_04212011_text.pdf

120111004M_Operator Response and Request for Time Extension_05252011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120111004M/120111004M_Operator%20Response%20and%20Request%20for%20Time%20Extension_05252011.pdf

120111004M_Closure Letter_10142011_text.pdf

U.S. Department 820 Bear Tavern Road, Suite 103
Of Transportation West Trenton, NJ 08628
Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
Overnight Express Mail
October 14, 2011
J.A. (Andy) Drake
Vice President, Asset Integrity
Spectra Energy Transmission, LLC
5400 Westheimer Court
Houston, TX 77056
CPF 1-2011-1004M
Dear Mr. Drake:
Between August 31 and October 21, 2010, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Spectra Energy Transmission, LLC’s (Spectra)
Gas Integrity Management Program in Houston, Texas. As a result of the inspection, Spectra
was issued a Notice of Amendment (NOA) on April 21, 2011. On May 31, 2011, Spectra was
granted an extension until August 1, 2011, to submit its amended procedures that fully address
the inadequacies identified in the NOA.
Spectra submitted its amended procedures on July 29, 2011. Upon review of the amended
procedures, it appears the inadequacies outlined in the NOA have been corrected. Therefore, this
letter is to inform Spectra no further action is necessary and this case is now closed.
Thank you for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration