{"operation":"document","citation":"CPF 120121021M","title":"TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-09-24","effective_on":null,"summary":"CLOSED notice of amendment citing 192.605(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120121021m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120121021m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120121021m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120121021M","body":"Notice of Amendment involving TRANSCONTINENTAL GAS PIPE LINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.605(a). The case was opened on 2012-09-24 and is reported as closed as of 2013-03-04. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120121021M_Closure Letter_03042013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121021M/120121021M_Closure%20Letter_03042013.pdf\n\n120121021M_Closure Letter_03042013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121021M/120121021M_Closure%20Letter_03042013_text.pdf\n\n120121021M_NOA_09242012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121021M/120121021M_NOA_09242012_text.pdf\n\n120121021M_Operator_Response_10232012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121021M/120121021M_Operator_Response_10232012.pdf\n\n120121021M_Closure Letter_03042013_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\nEXPRESS OVERNIGHT DELIVERY\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nMarch 4, 2013\nMr. Joe Neave, VP, Safety and Regulatory Compliance\nTranscontinental Gas Pipe Line Company\n2800 Post Oak Blvd.\nHouston, TX 77056\nCPF 1-2012-1021M\nDear Mr. Neave:\nDuring the week of March 26, 2012, a representative from the Pipeline and Hazardous Materials\nSafety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted\nan on-site pipeline safety inspection of Transcontinental Gas Pipe Line Company’s procedures in\nWhite Haven, PA. As a result of the inspection, Transcontinental Gas Pipe Line Company, LLC was\nissued a Notice of Amendment on September 24, 2012, which proposed amendment of your\nprocedures.\nTranscontinental Gas Pipe Line Company submitted its amended procedures on October 23, 2012.\nMy staff reviewed the amended procedures, and it appears that the inadequacies outlined in this\nNotice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2242}