# TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 120123003M
- **title:** TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-06-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2605(b)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120123003m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120123003m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120123003m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120123003M
**body:**

Notice of Amendment involving TRANSCONTINENTAL GAS PIPE LINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 193.2605(b)(1). The case was opened on 2012-06-11 and is reported as closed as of 2013-04-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120123003M_Closure Letter_04222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120123003M/120123003M_Closure%20Letter_04222013.pdf

120123003M_Closure_Letter_04222013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120123003M/120123003M_Closure_Letter_04222013_text.pdf

120123003M_NOA_06112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120123003M/120123003M_NOA_06112012.pdf

120123003M_NOA_06112012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120123003M/120123003M_NOA_06112012_text.pdf

120123003M_Operator Response_07102012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120123003M/120123003M_Operator%20Response_07102012.pdf

120123003M_Closure_Letter_04222013_text.pdf

U.S. Department of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
OVERNIGHT EXPRESS DELIVERY
April 22, 2013
Mr. Joseph Neave
VP, Safety and Regulatory Compliance
Transcontinental Gas Pipe line Company
2800 Post Oak Blvd.
Houston, TX 77056
CPF 1-2012-3003M
Dear Mr. Neave:
During the week of December 6, 2010, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Transcontinental Gas Pipe line Company’s,
(Transco) procedures at the Carlstadt LNG Plant. As a result of the inspection, Transco was
issued a Notice of Amendment on June 11, 2012, which proposed amendment of your
procedures.
Transcontinental Gas Pipe line Company submitted its amended procedures on July 11, 2012.
My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this
Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120123003M_Closure Letter_04222013.pdf

@
U.S. Department
of Transportation
Pipeline and
Hazardous Materials
Safety Administration
82o BearTavem Road, Suite ro3
West Trenton, NJ 08628
609.989.zajL
OVERNIGHT EXPRESS DELIVERY
4pil22,2013
Mr. Joseph Neave
VP, Safety and Regulatory Compliance
Transcontinental Gas Pipe line Company
2800 Post Oak Blvd.
Houston, TX 77056
cPF r-20r2-3003M
Dear Mr. Neave:
Plring.the week of December 9._ ?o-r_O,.a representative from the pipeline and Hazardous
Materials.safety Administration (PHMSA), p*iufl! to chapter 601 of 4^9 uniteJ states coae,
:3111"^,:$:,1^1T:il. tip^"Jt_qrSftty_ inspecrion of rranscoritinenral cas eipe line Company's,
( r ransco) procedures at the Carlstadt LNG Plant. As a result of the insp6ction. Transco was
issued a Notice of Amendment on June fi,20rt, *hi"h p;d;;-'"i"i,ia-."i^"r y"*
procedures.
Transcontinental Gas Pipe line company submitted its amended procedures on July I r, z0l2.
My staff reviewed the amended procedures, and it appears that the inadequacies outiined in this
Notice of Amendment have been conected.
lT:.Pj:.^r:-i"_llf^1r- Vou no turther action is necessary and this case is now closed. Thank you
Ior your cooperatlon.
Sincerely,
nqt( trh4-wl r
ilv
B)ion Coy, PE
Director, Eastem Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 3675