{"operation":"document","citation":"CPF 120125011M","title":"MOBIL  PIPE  LINE COMPANY — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-06-11","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120125011M","body":"Notice of Amendment involving MOBIL  PIPE  LINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2012-06-11 and is reported as closed as of 2012-08-22. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120125011M_Closure Letter_0822012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Closure%20Letter_0822012_text.pdf\n\n120125011M_Closure Letter_08222012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Closure%20Letter_08222012.pdf\n\n120125011M_NOA_06112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_NOA_06112012.pdf\n\n120125011M_NOA_06112012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_NOA_06112012_text.pdf\n\n120125011M_Operator Response_07112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Operator%20Response_07112012.pdf\n\n120125011M_Closure Letter_0822012_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nAugust 22, 2012\nJimmie E. James, VP & Northern Ops Mgr.\nExxonMobil Pipeline Co.\n3225 Gallows Rd.\nFairfax, VA 22037\nCPF 1-2012-5011M\nDear Jimmie James:\nDuring the week of November 14, 2011, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of ExxonMobil’s procedures in East Providence,\nRI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11,\n2012, which proposed amendment of your procedures.\nExxonMobil submitted its amended procedures on July 11, 2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration\n\n120125011M_Closure Letter_08222012.pdf\n\n@\nU,S, DepOftmgnt 820 Bear Tavern Road, suite to3\nOf TfOnSpOftOtion west rrenton, NJ 08628\nPlpeline and 009.989.2t 7l\nHazardous Materials\nSafery Administration\nEXPRESS OVERIYIGHT DELIVERY\nAtgrst22,2012\nJimmie E. James, VP & Northem Ops Mgr.\nExxonMobil Pipeline Co.\n3225 Gallows Rd.\nFairfax,YA 22037\ncPF 1-2012-5011M\nDear Jimmie James:\nDuring the week of November 14, 2011, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of ExxonMobil's procedures in East Providence,\nRI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11,\n2012, which proposed amendment of your procedures.\nExxonMobil submitted its amended procedures on July 11,2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no fi.rther action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nAc/1, I2V.-/--t'\"tY 1 1\n'uvv\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":3495}