# MOBIL  PIPE  LINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 120125011M
- **title:** MOBIL  PIPE  LINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-06-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120125011m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120125011M
**body:**

Notice of Amendment involving MOBIL  PIPE  LINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2012-06-11 and is reported as closed as of 2012-08-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120125011M_Closure Letter_0822012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Closure%20Letter_0822012_text.pdf

120125011M_Closure Letter_08222012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Closure%20Letter_08222012.pdf

120125011M_NOA_06112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_NOA_06112012.pdf

120125011M_NOA_06112012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_NOA_06112012_text.pdf

120125011M_Operator Response_07112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125011M/120125011M_Operator%20Response_07112012.pdf

120125011M_Closure Letter_0822012_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
EXPRESS OVERNIGHT DELIVERY
August 22, 2012
Jimmie E. James, VP & Northern Ops Mgr.
ExxonMobil Pipeline Co.
3225 Gallows Rd.
Fairfax, VA 22037
CPF 1-2012-5011M
Dear Jimmie James:
During the week of November 14, 2011, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of ExxonMobil’s procedures in East Providence,
RI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11,
2012, which proposed amendment of your procedures.
ExxonMobil submitted its amended procedures on July 11, 2012. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120125011M_Closure Letter_08222012.pdf

@
U,S, DepOftmgnt 820 Bear Tavern Road, suite to3
Of TfOnSpOftOtion west rrenton, NJ 08628
Plpeline and 009.989.2t 7l
Hazardous Materials
Safery Administration
EXPRESS OVERIYIGHT DELIVERY
Atgrst22,2012
Jimmie E. James, VP & Northem Ops Mgr.
ExxonMobil Pipeline Co.
3225 Gallows Rd.
Fairfax,YA 22037
cPF 1-2012-5011M
Dear Jimmie James:
During the week of November 14, 2011, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of ExxonMobil's procedures in East Providence,
RI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11,
2012, which proposed amendment of your procedures.
ExxonMobil submitted its amended procedures on July 11,2012. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no fi.rther action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Ac/1, I2V.-/--t'"tY 1 1
'uvv
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 3495
