{"operation":"document","citation":"CPF 120125015M","title":"KIANTONE PIPELINE CORP — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-07-17","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125015m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125015m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120125015m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120125015M","body":"Notice of Amendment involving KIANTONE PIPELINE CORP. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2012-07-17 and is reported as closed as of 2012-08-30. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120125015M_Closure Letter_08302012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125015M/120125015M_Closure%20Letter_08302012.pdf\n\n120125015M_Closure Letter_08302012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125015M/120125015M_Closure%20Letter_08302012_text.pdf\n\n120125015M_NOA_07172012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125015M/120125015M_NOA_07172012.pdf\n\n120125015M_NOA_07172012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125015M/120125015M_NOA_07172012_text.pdf\n\n120125015M_Operator Response_08062012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120125015M/120125015M_Operator%20Response_08062012.pdf\n\n120125015M_Closure Letter_08302012_text.pdf\n\nU.S. Department of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nAugust 30, 2012\nMr. Myron L. Turfitt, President\nUnited Refining Company\n15 Bradley St.\nWarren, PA 16365\nCPF 1-2012-5015M\nDear Mr. Turfitt:\nDuring the week of December 5, 2011, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of Kiantone Pipeline Corporation’s procedures in\nWest Seneca, NY. As a result of the inspection, Kiantone Pipeline Corporation was issued a\nNotice of Amendment on July 17, 2012, which proposed amendment of your procedures.\nKiantone Pipeline Corporation submitted its amended procedures on August 6, 2012. My staff\nreviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2274}