{"operation":"document","citation":"CPF 120131013M","title":"CENTRAL NEW YORK OIL AND GAS CO LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-08-08","effective_on":null,"summary":"CLOSED notice of amendment citing 192.225(a), 192.605(b)(9).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120131013M","body":"Notice of Amendment involving CENTRAL NEW YORK OIL AND GAS CO LLC. PHMSA's enforcement data identifies the cited regulations as 192.225(a),  192.605(b)(9). The case was opened on 2013-08-08 and is reported as closed as of 2013-09-30. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120131013M_Closure Letter_09302013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Closure%20Letter_09302013.pdf\n\n120131013M_Closure Letter_09302013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Closure%20Letter_09302013_text.pdf\n\n120131013M_NOA_08082013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_NOA_08082013.pdf\n\n120131013M_NOA_08082013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_NOA_08082013_text.pdf\n\n120131013M_Operator Response_09062013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Operator%20Response_09062013.pdf\n\n120131013M_Closure Letter_09302013_text.pdf\n\nU.S. Department of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nEXPRESS OVERNIGHT DELIVERY\nSeptember 30, 2013\nMr. Barry Cigich, VP Ops & Engineering\nInergy Midstream.\nTwo Brush Creek Boulevard, Suite 200\nKansas City, MO 64112\nCPF 1-2013-1013M\nDear Mr. Cigich:\nFrom March 26-30, 2012, a representative of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the\nCentral New York Oil and Gas (CNYOG) pipeline facilities’ (a subsidiary of Inergy Midstream),\nprocedures and records in Bradford County, PA, and Owego, NY.\nAs a result of the inspection, CNYOG was issued a Notice of Amendment on August 8, 2013,\nwhich proposed amendment of your procedures.\nCNYOG submitted its amended procedures in letter dated September 6, 2013. My staff\nreviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2342}