# CENTRAL NEW YORK OIL AND GAS CO LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 120131013M
- **title:** CENTRAL NEW YORK OIL AND GAS CO LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-08-08
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.225(a), 192.605(b)(9).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120131013m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120131013M
**body:**

Notice of Amendment involving CENTRAL NEW YORK OIL AND GAS CO LLC. PHMSA's enforcement data identifies the cited regulations as 192.225(a),  192.605(b)(9). The case was opened on 2013-08-08 and is reported as closed as of 2013-09-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120131013M_Closure Letter_09302013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Closure%20Letter_09302013.pdf

120131013M_Closure Letter_09302013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Closure%20Letter_09302013_text.pdf

120131013M_NOA_08082013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_NOA_08082013.pdf

120131013M_NOA_08082013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_NOA_08082013_text.pdf

120131013M_Operator Response_09062013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120131013M/120131013M_Operator%20Response_09062013.pdf

120131013M_Closure Letter_09302013_text.pdf

U.S. Department of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
EXPRESS OVERNIGHT DELIVERY
September 30, 2013
Mr. Barry Cigich, VP Ops & Engineering
Inergy Midstream.
Two Brush Creek Boulevard, Suite 200
Kansas City, MO 64112
CPF 1-2013-1013M
Dear Mr. Cigich:
From March 26-30, 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the
Central New York Oil and Gas (CNYOG) pipeline facilities’ (a subsidiary of Inergy Midstream),
procedures and records in Bradford County, PA, and Owego, NY.
As a result of the inspection, CNYOG was issued a Notice of Amendment on August 8, 2013,
which proposed amendment of your procedures.
CNYOG submitted its amended procedures in letter dated September 6, 2013. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2342
