# TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 120133003M
- **title:** TRANSCONTINENTAL GAS PIPE LINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-08-20
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2503(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-120133003m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-120133003m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-120133003m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/120133003M
**body:**

Notice of Amendment involving TRANSCONTINENTAL GAS PIPE LINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 193.2503(b). The case was opened on 2013-08-20 and is reported as closed as of 2013-09-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120133003M_Closure Letter_09302013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120133003M/120133003M_Closure%20Letter_09302013.pdf

120133003M_Closure Letter_09302013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120133003M/120133003M_Closure%20Letter_09302013_text.pdf

120133003M_NOA_08202013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120133003M/120133003M_NOA_08202013.pdf

120133003M_NOA_08202013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120133003M/120133003M_NOA_08202013_text.pdf

120133003M_Operator Response_09092013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120133003M/120133003M_Operator%20Response_09092013.pdf

120133003M_Closure Letter_09302013_text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
OVERNIGHT EXPRESS DELIVERY
September 30, 2013
Mr. Joe R. Neave
VP, Safety and Regulatory Compliance
Transcontinental Gas Pipe Line Company
2800 Post Oak Blvd
Houston, TX 77056
CPF 1-2013-3003M
Dear Mr. Neave:
During the week of October 15, 2012, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Transcontinental Gas Pipe Line Company’s
(Transco) procedures in Carlstadt, NJ. As a result of the inspection, Transco was issued a Notice
of Amendment on August 20, 2013, which proposed amendment of your procedures.
Transco submitted its amended procedures on September 9, 2013. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you that no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Byron Coy, PE
Director, PHMSA ER
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2311