{"operation":"document","citation":"CPF 120135010M","title":"BUCKEYE PARTNERS, LP — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-07-15","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(c)(3).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135010m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135010m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-120135010m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/120135010M","body":"Notice of Amendment involving BUCKEYE PARTNERS, LP. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2013-07-15 and is reported as closed as of 2013-10-17. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n120135010M_Closure Letter_10172013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135010M/120135010M_Closure%20Letter_10172013.pdf\n\n120135010M_Closure Letter_10172013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135010M/120135010M_Closure%20Letter_10172013_text.pdf\n\n120135010M_NOA_07152013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135010M/120135010M_NOA_07152013.pdf\n\n120135010M_NOA_07152013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135010M/120135010M_NOA_07152013_text.pdf\n\n120135010M_Operator_Request_for_Time_Extension_and_Response_to_Notice_08082013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120135010M/120135010M_Operator_Request_for_Time_Extension_and_Response_to_Notice_08082013.pdf\n\n120135010M_Closure Letter_10172013_text.pdf\n\nU.S. Department Of Transportation Pipeline and 609.989.2171\nHazardous Materials\nSafety Administration\n820 Bear Tavern Road, Suite 103\nWest Trenton, NJ 08628\nOVERNIGHT EXPRESS MAIL\nOctober 17, 2013\nThomas Scott Collier\nVP, Performance Assurance & Asset Integrity\nBuckeye Partners, L.P.\nFive TEK Park\n9999 Hamilton Boulevard\nBreinigsville, PA 18031\nCPF 1-2013-5010M\nDear Mr. Collier:\nOn April 30, 2012, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), Office of Pipeline Safety (OPS), pursuant to chapter 601 of 49 United\nStates Code, inspected Buckeye Partners, L.P.’s (Buckeye) procedures for corrosion control in\nMalvern, Pennsylvania. As a result of the inspection, Buckeye was issued a Notice of\nAmendment on July 15, 2013, which proposed amendment of your procedures.\nBuckeye submitted its amended procedures on September 24, 2013. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nByron Coy, PE\nDirector, Eastern Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2379}